HomeGeneral InformationMedia / PublicationsTenders / ContractsA - Z
About UsProducts / E-ServicesCustomer ServiceCommunity 
 
For water, used water
and drainage matters
General Information
Facts & Figures
lines
Water Treatment
lines
Earth Control Measures
lines
Procedure for Water Service
lines
Notification / Certification of NEWater Service Works
lines
Handbook on Application for Water Supply
lines
Standard Specifications
lines
Standard Drawings
lines
Fittings & Standards
lines
Licensed Plumbers
lines
Sewerage and Sanitary Works
lines
R & D
lines
Code of Practices
lines
Preconsultation on Sewerage Works
lines
Consultation on Drainage Works
lines

   Fittings & Standards

All water fittings such as flushing cisterns, flush valves, pipes, pipe fittings, taps, valves, etc for use in potable water service installations in Singapore shall comply with the standards and requirements stipulated by PUB. Prior PUB approval for the water fittings is not required but suppliers, retailers and installers shall ensure that the water fittings comply with the standards and requirements stipulated by PUB and that their use in potable water service installations conform to the Public Utilities (Water Supply) Regulations and Singapore Standard CP48 : Code of Practice for Water Services. For flush valves and flushing cisterns, suppliers, retailers and installers of such fittings shall have to ensure compliance with the requirements on backflow prevention and wastage of water as stipulated in the Public Utilities (Water Supply) Regulations and the Singapore Standard CP48 : Code of Practice for Water Services.

You can access the standards and requirements stipulated by PUB for the various water fittings by clicking on the link "Standards for Fittings " below.

If standards and requirements for a water fitting are not stipulated, the supplier, retailer or installer shall approach PUB to stipulate the necessary standards and requirements for compliance. They are to contact PUB at:

Inspectorate Branch
Water Supply (Network) Department
Public Utilities Board
40 Scotts Rd #10-01
Environment Building
Singapore 228231
Telephone: 67313577 / 67313859 / 67313518 / 67313850
Fax: 67313023
E-mail: pub_waterfittings@pub.gov.sg

Any clarification or feedback can also be directed to the above address.

A water fitting shall be deemed to comply with the stipulated standards if it is certified or tested as complying with such standards by a conformity assessment body (product certification body/testing laboratory) accredited by the Singapore Accreditation Council (SAC) or its Mutual Recognition Arrangement (MRA) partners. Separate approval from PUB for the water fitting is not required. However, fittings must be supported with valid, complete and full test reports and certificates. Suppliers/retailers shall ensure that these test reports and certificates of all the water fittings which they offer for sale, advertise, display, sell or supply are properly kept and must be produced for verification upon request by PUB. PUB continues to conduct checks and will take action against non-compliance.

PUB reviews the Standards and requirements stipulated for water fittings regularly to allow for innovation and changes in technology and to ensure relevance.

Standards for Fittings
Glossary
Circular (dated 23 Oct 08) on the Mandatory Water Efficiency Labelling Scheme (MWELS) and the mandatory installation of dual flush Low Capacity Flushing Cisterns
Public Utilities (Water Supply) (Amendment) Regulations 2008 for Mandatory Water Efficiency Labelling Scheme and Mandatory installation of Dual Flush Low Capacity Flushing Cisterns
Circular (dated 13 Apr 09) on the Public Utilities (Water Supply) (Amendment) Regulations 2008
Circular(dated 13 Apr 09) on Testing Requirements & Mandatory Water Efficiency Labelling of Dual Flush Low Capacity Flushing Cisterns
Circular (dated 13 Apr 09) on PUB Compliance Requirements for Water Fittings & Display of Water Fittings for Export Only
Circular (dated 13 Apr 09) on FAQs on MWELS & Testing Requirements for Water Fittings