13. MAINTAINING THE INTEGRITY OF THE STORM WATER DRAINAGE SYSTEM INCLUDING FLOOD PROTECTION MEASURES

  13.1

Responsibility of Developer/Owner

  13.2

Flood Protection Measures (i.e. Crest/Flood barriers/Pumped drainage system)

 

  13.1

Responsibility of Developer/Owner

 

The Developer/Owner shall be responsible for the maintenance, operation and monitoring of the storm water drainage systems within their premises. These include, but are not limited to, regular adequacy checks on the flood protection measures such as minimum crest levels, detention/retention pond systems and pumped drainage system.

 

  13.2

Flood Protection Measures (i.e. Crest/Flood barriers/Pumped drainage system)

 

The Developer/Owner shall submit the certificate of inspection and survey plan endorsed by the Architect (i.e. QP of the development) or Professional Engineer to confirm that the approved flood protection measures, including crest protection measures, flood barriers and pumped drainage systems are in place. This certificate of inspection and survey plan shall be submitted annually upon obtaining the Temporary Occupation Permit (TOP), for all developments.

 
 