|
Deployment of Water Quality Profiling Stations at Kallang Basin
| Date of Notice |
: 28 Mar 2011 |
| Project Duration |
: 29 Mar 2011 to 12 Apr 2011 |
| Location |
: Kallang Basin |
| Time |
: 0930 hrs to 1730 hrs |
| Contractor |
: SysEng(S) Pte Ltd |
| Contact |
: Mr Xavier @ 9296 7185 |
1. SysEng(S) Pte Ltd will deploy 2 nos. water quality profiling stations on 29 Mar 2011,from 0930 hrs to 1730 hrs at the locations shown in the map below . The platforms will be towed from near the Ducktours splashpoint to the designated locations by boat. Thereafter the water quality profiling stations will remain at the locations until 12 Apr 2011.
| 1 |
1° 17' 59.72"N |
103° 52' 7.63"E |
| 2 |
1° 17' 50.65"N
|
103° 51' 53.87"E |
2. Yellow lights flashing once every 5 secs will be placed on the platforms.
3. All vessels are advised to keep clear of the profiling stations at all times.

|
|
|
|
|
|
|
|