Announcements
|
Date
|
Title
|
| 4 Sep 2010 | SDBA-AUSTCHAM 10km Dragon Boat Challenge 2010
| 30 Aug 2010
- 25 Sep 2010 | Mid Autumn Festival By The River 2010
| 24 Aug 2010
- 30 Sep 2010 | Desilting Works Between Crawford Bridge and Sir Arthur's Bridge (Extension)
| 17 Aug 2010
- 25 Aug 2010 | Singapore Youth Olympic Games 2010: Public is advised not to engage in kite-flying activities from 17 Aug 2010 to 18 Aug 2010 & from 21 Aug 2010 to 25 Aug 2010.
| 17 Aug 2010
- 17 Sep 2010 | Marina Reservoir Underwater Aeration pipes - Marina Bay, Marina Channel & Kallang Basin
| | 13 Aug 2010 | SYOG's Journey of the Youth Olympic Flame
| 13 Aug 2010
- 27 Aug 2010 | Installation of Sea Gates for SYOG 2010 Opening & Closing Ceremony
| 5 Aug 2010
- 29 Aug 2010 | Installation of SYOG 2010 Fountain Barge and Display
| 3 Aug 2010
- 29 Aug 2010 | Closure of Marina Bay during SYOG Opening and Closing Ceremonies and Rehearsals
| 1 Aug 2010
- 31 Dec 2010 | Proposed Marine Deck at Marina Bay Sands
| 27 Jul 2010
- 30 Aug 2010 | Youth Olympic Games (YOG), Singapore
| 2 Jul 2010
- 31 Dec 2010 | Sampling and Monitoring Works in Marina Reservoir
| 26 Jun 2010
- 9 Aug 2010 | National Day Parade Show & Rehearsals: Kite Flying To Cease During Air Force Fly Past
| 16 Jun 2010
- 12 Aug 2010 | Installation of NDP 2010 Fireworks Barge and Fireworks Display
| | 9 Jun 2010 | Alternative Carpark at Marina Barrage
| 7 Jun 2010
- 26 Aug 2010 | Singapore River Enhancement Project - Installation of new light fittings and cable support system
| 20 May 2010
- 31 Jul 2010 | Dismantling of Turbidity Curtain at Marina South and Marina East
| | 28 Mar 2010 | Realignment of Marina Way and Marina Boulevard
| 25 Mar 2010
- 31 Jul 2010 | Desilting Works Between Crawford Bridge and Sir Arthur's Bridge
| | 1 Dec 2009 | Operating hours of the Singapore Sustainable Gallery
| | 24 Sep 2009 | Mooring Buoys in Marina Reservoir
| | 8 Sep 2009 | Rocky Area in Kallang Basin - Updated on 08 Sep 2009
| | 29 Jul 2009 | Changes to Marina Barrage Shuttle Service Timings
| 1 Jun 2009
- 1 Jun 2010 | Lower Boardwalk for Proposed Waterfront Promenade
| 5 May 2009
- 31 Jul 2010 | Proposed Marine Deck at Marina Bay Sands
| | 8 Aug 2008 | Marina Reservoir Underwater Aeration Pipes - Marina Bay, Marina Channel & Kallang Basin
| | 29 May 2008 | Barrage Safety
| | 7 Apr 2007 | Navigational Safety Directive
| | Installation of the three Lake Diagnostic System (LDS) in Marina Reservoir
| | Installation of Turbidity Curtain for Proposed Gardens By The Bay at Marina South and Marina East
|
|
|
|
|
|
|
| |
|
|
| |
|
|
|