Sign In
True

​​

Notice Detail

 

 

ANNUAL INSPECTION BELOW SIR ARTHUR’S BRIDGE FOR SP POWERASSET23https://www.pub.gov.sg/marinabarrage/notices/ANNUALINSPECTIONBELOWSIRARTHURSBRIDGEFORSPPOWERASSETANNUAL INSPECTION BELOW SIR ARTHUR’S BRIDGE FOR SP POWERASSETOverview<div class="scrollbar" style="display:none;"><div class="handle" style="width:871px;"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0" style="overflow:hidden;"><div class="scrollbar" style="width:0px;display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><table width="100%" class="tablestandard bookingstep2 extend-mg-btm" border="0" cellspacing="0" cellpadding="0" style="width:100%;max-width:none;"><tbody><tr><td class="col_header green" style="width:180px;">Date of Notice</td><td> <strong>14 Feb 2020</strong></td></tr><tr><td class="col_header green" style="width:180px;">Period of Work</td><td> <strong>19 Feb 2020 to 21 Feb 2020 </strong></td></tr><tr><td class="col_header green" style="width:180px;">Time of Work</td><td> <strong>0900 hrs to 1800 hrs</strong></td></tr><tr><td class="col_header green" style="width:180px;">Location</td><td> <strong>Sir Arthur’s Bridge​</strong></td></tr><tr><td class="col_header green" style="width:180px;">​Craft</td><td> <strong>RC 262 Work Platform with Scaffold​<br> RZ 064 or RZ 073 Towing Boat<br> SZ 16918E Safety Boat<br>​ ​</strong></td></tr><tr><td class="col_header green" style="width:180px;">​Contact</td><td> <strong>Chua Choon Ling @ 9487 9966 (Metalworld Pte Ltd)​</strong></td></tr></tbody></table></div></div></div><p>1.  Metalworld Pte Ltd is the appointed contractor by SP PowerAssets Pte Ltd to inspect all existing and replace missing security harness such as aluminium coverings plates, security bolts, hinges and related connections for SP PowerAssets transmission cable below Sir Arthur’s Bridge to ensure the security coverings are properly secured.</p><p>2.  RC 262 work platform with scaffold would be deployed to allow workers to access the underside of the bridge in order to carry out the inspection. SZ 16918E safety boat would be present to facilitate the entire operation.</p><p style="text-align:center;"> <img class="border-0" src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Metalworld-RC-262.JPG" alt="" style="margin:5px;" /> </p><p style="text-align:center;text-decoration:underline;"> <strong>Photos of RC 262 Work platform with Scaffold​</strong>​​</p><p>3.   RC 262 work platform would be lowered into the water using a lorry crane from Block 12 Upper Boon Keng Road via the PCN entrance before towing to Sir Arthur’s Bridge to carry out the inspection works. Same location will be used for craning up the work platform for demobilisation. The towing operation would be carried out with either RZ 064 or RZ 073 towing boat and SZ 16918E safety boat. Blinker lights and warning signs will be installed on the work platform to warn other reservoir users.</p><p style="text-align:center;"> <img class="border-0" src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Metalworld-WorkPlan.JPG" alt="" style="margin:5px;width:529px;" /> ​​ ​ <br> </p><p style="text-align:center;text-decoration:underline;"> <strong>Launch Site and Towing Route of RC 262 Work Platform</strong>​​</p><p>​4.   ​All vessels are advised to keep a wide berth from RC 262 work platform, slow down when in the vicinity of the inspection areas and to keep a look out of the blinker lights on the work platform.​</p>​