Sign In
True

​​

Notice Detail

 

 

Benjamin Sheares Bridge Bearings Replacement Works (Phase 2 and 3)http://www.pub.gov.sg/marinabarrage/notices/BenjaminShearesBridgeBearingsReplacementWorksPhase2and3Benjamin Sheares Bridge Bearings Replacement Works (Phase 2 and 3)Overview<table width="100%" class="ms-rteTable-GreenShade" cellspacing="0"><tbody><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;height:70px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Date of Notice</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;height:70px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"> <strong>23 Jul 2019​</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Period of Work</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​25 Jul 2019 to 11 Nov 2019​</span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Time of Work</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"> <strong>0830 hrs to 2230 hrs</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Location</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"> <strong>​Benjamin Sheares Bridge​</strong></span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Craft</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​<strong>RC 265 Safety Boat​</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Contacts</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​<strong>Sathish @ 9029 6464 (Gim Tian Civil Engineering)<br>Jimmy @ 9017 7429 (Gim Tian Civil Engineering) </strong></span></td></tr></tbody></table>​ <p>1.   Gim Tian Civil Engineering Pte Ltd is the appointed contractor by LTA to carry out Replacement of Vehicular Bridge Bearings and the scope of proposed works as follow: <br> <br>Phase 2 – Installation of temporary platform scaffold access to the underside of Benjamin Sheares Bridge <br>​ <br> ​Phase 3 – Carry out jacking operation & bearings replacement works at piers P6, P7 and P8 ​</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/MOOG-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Photo of the MOOG Machine</strong></p><p>​ 2.   RC 265 safety boat would be deployed at the respective pier locations daily at 0830 hrs from the amphibious vessel splash point near the F1 Pit Stop Building. The safety boat would be lifted out by a lorry crane from the splash point daily after works at 1700 hrs. </p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/RC-265-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Photo of RC 265 Safety Boat</strong></p><p>​3.   At least two (2) sets of oil containment boom in yellow with warning lights would be deployed on waters to demarcate the area directly underneath where the MOOG machine is operating. RC 265 safety boat would be deployed nearby to keep out approaching vessels. All vessels are to adhere to the instructions from the safety boat operator.</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Oil-Boom-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Sample Photo of the Oil Containment Boom in Yellow</strong></p><p>4.   Proposed schedule of works for Phase 2 & 3 are as follow:​</p><table width="100%" class="tablestandard bookingstep2 extend-mg-btm" border="0" cellspacing="0" cellpadding="0" style="max-width:none;width:100%;"><tbody><tr class="row_header"><td>PERIOD OF WORKS</td><td>WORKS DESCRIPTION</td></tr><tr class="extheight1"><td>25 Jul 2019 – 10 Sep 2019</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P6</td></tr><tr class="extheight1"><td>01 Aug 2019 – 05 Oct 2019</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P7</td></tr><tr class="extheight1"><td>10 Aug 2019 – 11 Nov 2019</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P8</td></tr></tbody></table>​ <p>5.   Please refer to the <a href="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageDocuments/Gim-Tian-MOOG-%28Phase%202%29.pdf" style="text-decoration:underline;">drawings</a> for the pier locations and water traffic plan throughout the works period. </p><p>6.   All vessels are advised to look out for the oil containment boom, keep clear of the work areas and slow down when in the vicinity. </p>​8/23/2019 6:40:58 AM