Sign In
True

​​

Notice Detail

 

 

Repair and Maintenance Works at Various Bridges287https://www.pub.gov.sg/marinabarrage/notices/RepairandMaintenanceWorksatVariousBridgesRepair and Maintenance Works at Various BridgesOverview<div class="scrollbar" style="display:none;"><div class="handle" style="width:871px;"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0" style="overflow:hidden;"><div class="scrollbar" style="width:0px;display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><table width="100%" class="tablestandard bookingstep2 extend-mg-btm" border="0" cellspacing="0" cellpadding="0" style="max-width:none;width:100%;"><tbody><tr><td class="col_header green" style="width:180px;">Date of Notice</td><td> <strong>20 Feb 2020</strong></td></tr><tr><td class="col_header green" style="width:180px;">Period of Work​​</td><td> <strong>25 and 28 Feb 2020</strong></td></tr><tr><td class="col_header green" style="width:180px;">Locations</td><td> <strong>Geylang River, Marina Channel, Marina Bay and Singapore River</strong></td></tr><tr><td class="col_header green" style="width:180px;">Time</td><td> <strong>0900 hrs to 1800 hrs</strong></td></tr><tr><td class="col_header green" style="width:180px;">​Craft</td><td> <strong>RC 953 or 915 Work Boat<br> RC 241 Safety Boat​ ​</strong></td></tr><tr><td class="col_header green" style="width:180px;">​Contact</td><td> <strong>Mr Azman @ 9101 5504 (Fonda Global Engineering)<br>Mr Roslan @ 8323 4966 (Fonda Global Engineering) ​​</strong></td></tr></tbody></table></div></div></div></div><p>1. Fonda Global Engineering Pte Ltd is the appointed contractor by LTA to carry out lighting and electrical repair and maintenance works of Singapore Bridges on 25 and 28 Feb 2020. </p> ​ <ol type="1" style="margin-bottom:40px;"><li style="line-height:32.58px;font-size:18px;"> FB 952 Tanjong Rhu Road/Indoor Stadium/ Geylang River / Tanjong Rhu Bridge </li><li style="line-height:32.58px;font-size:18px;">VB 389 East Coast Parkway / Benjamin Sheare’s Bridge near Marina Square and Tanjong Rhu 1 </li><li style="line-height:32.58px;font-size:18px;"> VB 389 East Coast Parkway / Benjamin Sheare’s Bridge near Marina Square and Tanjong Rhu 2 </li><li style="line-height:32.58px;font-size:18px;"> VB 395 Esplanade Drive / Esplanade Bridge </li><li style="line-height:32.58px;font-size:18px;">VB 357 Connaught Drive / Singapore River / Anderson Bridge </li><li style="line-height:32.58px;font-size:18px;"> FB 749 Parliament Lane / Singapore River / Cavenagh Bridge </li><li style="line-height:32.58px;font-size:18px;"> VB 702 North Bridge Road / Singapore River/ Elgin Bridge </li><li style="line-height:32.58px;font-size:18px;">VB 676 New Bridge Road / Singapore River / Coleman Bridge </li><li style="line-height:32.58px;font-size:18px;">FB 813 Read Street / Singapore River / Read Bridge </li><li style="line-height:32.58px;font-size:18px;"> VB 382 Clemenceau Avenue / Singapore River near Riverview Hotel & Robertson Quay </li><li style="line-height:32.58px;font-size:18px;"> FB 823 Robertson Quay / Riverview Roberson Bridge </li></ol>​​​ ​ <p>2. Refer to the water traffic plan <font class="ms-rteThemeForeColor-9-4" color="#0066cc"> <strong> <a href="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageDocuments/Location-Plan-2020-02-20.pdf" target="_blank" style="text-decoration:underline;"> <span class="ms-rteForeColor-2" style="text-decoration:underline;">here</span></a>​</strong></font>, RC 953 or 915 work boat will be deployed to allow workers to access the underside of bridges in order to carry out the works. RC 241 safety boat will be deployed to warn other vessels from entering the work site throughout the work period. Both vessels will be installed with blinker lights. </p><p>3. Both vessels will return to Republic Avenue and berth near Marina Promenade daily after work at 1800 hrs. </p><p>4. All vessels are advised to keep clear and slow down when in the vicinity of the work site and to keep a look out of the blinker lights on the vessels. ​ ​​</p>​​​