Contractors shall ensure that all activities carried out at the construction sites do not cause muddy water pollution at all times.
Price for erosion control adequately in the tenderEngage a Professional, Qualified Erosion Control Professional (QECP) to design and implement erosion control measures (ECM)Obtain ECM approval from PUB Work with QECP to implement ECM before earthwork startsDuring work, adopt best practices for ECM Monitor site and comply with discharge standard at all time
Sample Tender Specifications