Official website links end with .gov.sg
| Likely Month of Purchase | Project | Registration Head | Financial Category | Particulars | Department |
|---|---|---|---|---|---|
| Mar 2026 |
Professional Engineering Services for Proposed Sewers to serve Tengah New Town (Schedule 3) |
PSPC_CS01 | P0 | Tay Choo Him Mobile:97200448 [email protected] Lee Jia Ying Mobile: 91769431 [email protected] |
WRN |
| Mar 2026 | Enterprise Video Analytics | EPU/CMP/10 | S6 | Sanni Amir Mobile:93849675 [email protected] Adrian Eu Mobile: 96529745 [email protected] |
IDTD |
| Mar 2026 | Maintenance of Influent and Effluent Pumping Systems at CWRP | ME11 | L6 | Elvandro Yu Mobile:83681494 [email protected] |
WRP |
| Mar 2026 | Removal of Grit, Screenings and Flotsam at WRPs and WRN installations | FM02 | L3 | Liow Kuan Koon Mobile:96680729 [email protected] Anson Tan Mobile: 91727947 [email protected] |
WRP |
| Mar 2026 | Maintenance of Aeration Blowers for Water Reclamation Plants | ME11 | L3 | Anson Tan Mobile:91727947 [email protected] Liow Kuan Koon Mobile: 96680729 [email protected] |
WRP |
| 20 Mar 2026 | Site Specific Study for Climate Change Adaptation Measures at Southwest Coast of Singapore | SER/34 | S10 | Lim Si Xuan Mobile:94595199 [email protected] Ong Jian Cheng Mobile: 94877343[email protected] |
CPD |
| April 2026 | Smart Locks for Plants and Installations | EPU/CMP/10 | S4 | Randal Chua Mobile:83027094 [email protected] |
IDTD |
| April 2026 | Provision of Services for Quality Assurance of CCTV Inspection reports of sewer and manholes | SER/34/CW02 | S5/C2 | Solihin Mobile:81000806 [email protected] |
WRN |
| May 2026 | Consultancy Services for Safety Inspection of Dams, Dykes and Ancillary Structures in Singapore and Johor | PSPC_CS01 | P0 - Refer to selected PSPC Panel | Leo Xin Yi Mobile:87238889 [email protected] Kho Chen Chung Mobile: 92285155 [email protected] |
CW |
| May 2026 | Maintenance of Liquids Stream Equipment at Changi Water Reclamation Plant | ME11 | L6 | Yap Jia Kai Joseph Mobile:91194903 [email protected] Asmani Samat Mobile: 97545132 [email protected] |
WRP |
| May 2026 | Development of Integrated Operations Broadcast System (I-OPS) | EPU/CMP/10 | S6 | Shanice Yong Mobile:90661299 [email protected] |
IDTD |
| June 2026 | Installation and Integration of an Automated System for Pumping Water from Pandan Canal into Pandan Reservoir | PSPC_ME02 | L1 | Kathleen Lee Mobile:81634830 [email protected] Fattah Mobile: 92229625 [email protected] |
CW |
| Sep 2026 | Professional Engineering Services for Sewer Realignment to New Kranji Water Reclamation Plant | SER/34 | S8 | Warren Khor Mobile:98323043 [email protected] Weningtiyas Mobile: 91407302 [email protected] |
WRN |
| S/N | Likely Month of Purchase | Project | Registration Head | Financial Category | Particulars | Department |
|---|---|---|---|---|---|---|
| Mar 2026 | Replacement of Aged Valves at Various WSN Installations | ME11/ME05 | L3/L1 | Zaahidah Tahir Hp: 91113536 [email protected] Darren Koh Hp: 98324834 [email protected] |
WSN | |
| Mar 2026 | Condition Assessment for Used Water Pumping mains and Deep Tunnel Sewerage System for 2026-2029 | CW02/CR07 | C1/L3 | Zhang Chong Hp: 90940063 [email protected] Muhammad Najib Bin Sardon Hp: 96671844 [email protected] |
WRN | |
| Mar 2026 | Repair, Maintenance and Associated Civil Works for Used Water Pumping mains and Deep Tunnel Sewerage System for 2026-2029 | CW02/CR07 | C1/L3 | Zhang Chong Hp: 90940063 [email protected] Muhammad Najib Bin Sardon Hp: 96671844 [email protected] |
WRN | |
| Mar 2026 | Replacement of Air Conditioning System at Tuas Desalination Plant | ME05 | L3 | Muhd Haqqan Abdullah Hp: 98304585 [email protected] |
WSP | |
| May 2026 | Proposed Sewers to serve Tengah New Town (Schedule 2) - Contract 1 | CW02 | A2 | Tay Choo Him Hp: 97200448 [email protected] |
WRN | |
| May 2026 | Digitalisation for Reconstruction of Choa Chu Kang Waterworks | ME02 | L5 | Charmaine XM Ng Hp: 92217249 [email protected] Zhong Wanyan Hp:97538990 [email protected] |
IDTD | |
| May 2026 | Replacement of Chemical Skids and pumps in Tuas Desalination Plant | ME11 | L3 | Fabian Fu Hp: 93853128 [email protected] |
WRP | |
| May 2026 | Digitalisation for Reconstruction of Choa Chu Kang Waterworks | ME02 | L5 | Charmaine XM Ng Hp: 92217249 [email protected] Zhong Wanyan Hp:97538990 [email protected] |
IDTD | |
| Jun 2026 | TUAS Water Reclamation Plant Contract 5B: Digital Infrastructure and Integrated Operations System | ME02 | L6 | Nur Amalina Binte Mohamad Zailani Tel: 67237867 [email protected] See Tian Bao Tel:67237864 [email protected] |
DTSS2 | |
| Sep 2026 | Proposed Sewers and Interim Pumping Station at Mandai Road Area | CW02 | A1 | Warren Khor Hp: 98323043 [email protected] Weningtiyas Hp: 91407302 [email protected] |
WRN | |
| Nov 2026 | Enhancement of Chemical Skids at Tuas Desalination Plant | ME11 | L2 | Kelvin Seoh Hp: 91703193 [email protected] |
WRP | |
| Nov 2026 | Renewal of Large Water Mains Package 3 | CR07 | L5 | Selvakumar Thanyasalam Hp: 92961409 [email protected] Dhany Hansidi Hp:91353458 [email protected] |
WSN | |
| Jan 2027 | Demolition of Pump Sump and Removal/Grouting of Abandoned Sewers at Lim Chu Kang Area | CR03/CW02 | C1 | Lee Jia Yi Hp: 83287280 [email protected] Seng Puay Chor Hp: 90128016 [email protected] |
WRN |