Sign In
True

​​

Notice Detail

 

 

Repair Works of the Retaining Wall at Former Merlion Parkhttp://www.pub.gov.sg/marinabarrage/notices/RepairWorksoftheRetainingWallatFormerMerlionParkRepair Works of the Retaining Wall at Former Merlion ParkOverview<div class="w100 border-0"><table cellspacing="0" width="100%" class="ms-rteTable-GreenShade"><tbody><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:21%;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​​​​<strong>Date of Notic​e​​</strong></span></th><td class="ms-rteTableOddCol-GreenShade" style="width:50%;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">05 November 2018​</span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:21%;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​<strong>Period of Work</strong></span></th><td class="ms-rteTableOddCol-GreenShade"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​12 November 2018 – 15 February 2019​</span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:21%;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​<strong>Time of Work</strong></span></th><td class="ms-rteTableOddCol-GreenShade"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​0800 hrs - 1900 hrs</span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:21%;height:96px;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​<strong>Location</strong></span></th><td class="ms-rteTableOddCol-GreenShade" style="height:96px;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">Former Merlion Park @ Waterboat House Garden</span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:21%;"> <span style="font-size:16pt;font-family:roboto-regular-webfont;"><strong>​​Contact</strong></span></th><td class="ms-rteTableOddCol-GreenShade"> <span style="font-size:16pt;font-family:roboto-regular-webfont;">​Mr. Bobby Woon @ 94566876 (Frontbuild Engineering & Construction Pte Ltd)<br><br>Mr. Andi @ 93862540 (Frontbuild Engineering & Construction Pte Ltd)​</span></td></tr></tbody></table>​​ <p style="font-size:18px;">1. This project is associated with BCA Contract T-574/2015 - Appointment of term contractor to maintain foreshore structures for BCA for a period of 3 years. Frontbuild Engineering & Construction Pte Ltd is the appointed contractor to carry out the repair works of the retaining wall at Former Merlion Park from 12 November 2018 to 15 February 2019. </p><p style="font-size:18px;"> <br> </p><p style="font-size:18px;"> 2. The location of repair of retaining wall at Former Merlion Park is shown below.</p><p style="font-size:18px;">​<img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Retaining%20Wall%20at%20Former%20Merlion%20Park.png" alt="" style="margin:5px;" /><br></p><p style="font-size:18px;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Retaining%20Wall%20at%20Former%20Merlion%20Park-1.JPG" alt="" style="margin:5px;" /> <br> </p><p style="font-size:18px;">3. The repair works will be carried out from 0800 hrs to 1900 hrs daily. The schedule of works are as follows:</p><table width="100%" class="ms-rteTable-Standard" cellspacing="0"><tbody><tr class="ms-rteTableHeaderRow-Standard"><th class="ms-rteTableHeaderEvenCol-Standard" rowspan="1" colspan="1" style="width:120px;">​Period of Works</th><th class="ms-rteTableHeaderOddCol-Standard" rowspan="1" colspan="1" style="width:440px;">​Description</th></tr><tr class="ms-rteTableOddRow-Standard"><td class="ms-rteTableEvenCol-Standard" style="width:120px;">​12/11/18 – 21/11/18​</td><td class="ms-rteTableOddCol-Standard" style="width:440px;">Erect Hoarding​</td></tr><tr class="ms-rteTableEvenRow-Standard"><td class="ms-rteTableEvenCol-Standard" style="width:120px;">​22/11/18 – 03/12/18​</td><td class="ms-rteTableOddCol-Standard" style="width:440px;">​Removing existing railing & floor​</td></tr><tr class="ms-rteTableOddRow-Standard"><td class="ms-rteTableEvenCol-Standard" style="width:120px;">23/11/18 – 13/12/18​</td><td class="ms-rteTableOddCol-Standard" style="width:440px;">​Erect Temporary Platform​</td></tr><tr class="ms-rteTableEvenRow-Standard"><td class="ms-rteTableEvenCol-Standard" style="width:120px;">14/12/18 – 25/01/19​</td><td class="ms-rteTableOddCol-Standard" style="width:440px;">Construct Retaining Wall​</td></tr><tr class="ms-rteTableOddRow-Standard"><td class="ms-rteTableEvenCol-Standard" style="width:120px;">28/01/19 – 01/02/19 ​</td><td class="ms-rteTableOddCol-Standard" style="width:440px;">Reinstall railing​</td></tr><tr class="ms-rteTableEvenRow-Standard"><td class="ms-rteTableEvenCol-Standard" style="width:120px;">04/02/19 – 15/02/19​</td><td class="ms-rteTableOddCol-Standard" style="width:440px;">Reinstatement Work​</td></tr></tbody></table>​ ​ <p style="font-size:18px;">4. All vessels are advised to keep clear of the work area and slow down when in the vicinity.</p> ​​ </div>​7/17/2019 2:28:28 PM