| Date of Notice | Period Of Work | Time Of Work | Location | Crafts | Contact |
|---|---|---|---|---|---|
| 22 April 2023 | 24 April 2023 – 27 April 2023 | 0830 hrs – 1800 hrs | Below Benjamin Shears Bridge at Marina Reservoir (see map below for location of bridge) |
RC 969 Work Boat | Mr. Derek Chong (Hp: 9832 99549832 9954
) / Mr. Lu Henri (Hp: 8694 85878694 8587
) (Asia Projects Engineering Pte. Ltd.) |
1.The main scope of work is to remove one existing pontoon from Under Benjamin Shears Bridge to be transported to Pandan Reservoir for installation.
2.RC 969 work Boat will be deployed to allow workers to access the corners and edges of the pontoon in order to carry out the dismantling works.
| Date | Working Area | Working Hours |
|---|---|---|
| 6 March – 8 March 2023 | Benjamin Shears Bridge | 0830 to 1800 |
All vessels and recreation Crafts are advised to keep a wide berth from RC 969 work boat, slow down when in the vicinity of the working areas and to keep a look out for the work boat on the working area.
| Date | Working Area | Working Hours |
|---|---|---|
| 6 March – 8 March 2023 | Benjamin Shears Bridge | 0830 to 1800 |
All vessels and recreation Crafts are advised to keep a wide berth from RC 969 work boat, slow down when in the vicinity of the working areas and to keep a look out for the work boat on the working area.