Date of Notice
18 Sept 2023
Period Of Work
27 Sept 2023 to 26 Mar 2027
Location
The Float @ Marina Bay
Crafts
SR3554H (Crane Barge), SR4007Z (Crane 
Barge), SR3589J (Tug Boat), RC413 (Tug Boat), 
RC 972 and SR3861Z (Workboat/Safety Boat), 
RC974 (working Platform)

Time
0000 hrs-2359 hrs
Contact
Asher Lum @ 9009 75079009 7507
Terrence Chan @ 9854955598549555 (MTC)

 

Expand Construction Pte Ltd is appointed by Defence Science & Technology Agency to construct the NS Square at Marina Bay. Marina Technology and Construction Pte Ltd (MTC) is the appointed Marine Specialist for the Marine Works. The Works will include the demolition of the existing floating platform, the installation of cofferdam, construction of new building, access bridges and pontoons, and the removal cofferdam & its associated construction equipment/plants. Table 1 shows the Construction Project Schedule. 
 
 
Refer to the attached drawing Figure 1 for the Master Site Plan. The limits of the construction boundaries, where vessels are required to keep clear, are defined by Navigation Buoys with respective navigation lights Buoy 1 & Buoy 2 at Working Area A as shown on Figure 2, and Buoy A & Buoy B at Working Area B as shown on Figure 3. 
 
All vessels are advised to keep clear of the construction boundaries and reduce to a speed of 5 knots while passing through the Temporary Navigation Buoys during the project duration.

 

Table 1

Construction Project Schedule

 

Start Date
End Date
Work Description
Month 1
(27 Sep 2023)
Month 2
(26 Nov 2023)
Mobilise machinery, plants and equipment, marine boreholes, and marine survey works
Month 3
(27 Nov 2023)
Month 10
(26 Jul 2024)
Removal of Floating Platform & Construction of Cofferdam
Month 11
(27 Jul 2024)
Month 30
(26 Mar 2026)
Construction of New Building and associated Marine Structures
Month 31
(27 Mar 2026)
Month 38
(26 Nov 2026)
Removal of Cofferdam, Installation of Floating Pontoons, Facade and Architectural Works
Month 39
(27 Nov 2026)
Month 42
(26 Mar 2027)
Landscape and M&E Works, de-mobilise machinery, plants and equipment

Table 2

Construction Work Boundary

Working Area A (Main Construction Site)

Point
Geographical Coordinates
Buoy Characterstics
Light Characteristics
Buoy 1
Lat    1° 17’15.97” N 
Long 103° 51’26.79” E
Yellow
Yellow Light with Flash
0.5 Sec on, 1.0 Sec Off
Buoy 2
Lat    1° 17’15.51” N  
Long 103° 51’37.00” E
Yellow
Yellow Light with Flash
0.5 Sec on, 1.0 Sec Off

 

Working Area B (Marina Launching Site)

Point
Geographical Coordinates
Buoy Characterstics
Light Characteristics
Buoy A
Lat    1° 17’57.30” N 
Long 103° 51’56.31” E
Yellow
Yellow Light with Flash
0.5 Sec on, 1.0 Sec Off
Buoy B
Lat    1° 17’52.97” N  
Long 103° 51’53.3” E
Yellow
Yellow Light with Flash
0.5 Sec on, 1.0 Sec Off

Figure 1 (Master Site Plan)

Location Plan of Working Area A & B

Figure 2 (Blown Up)

Working Area A - Main Construction Site

Figure 3 (Blown Up)

Working Area B - Marine Launch Site

 



SR 4007Z
SR3554H


SR3589J
RC 413


SR3861Z
RC 972

 