| Date of Notice |
18 Sept 2023 |
| Period Of Work |
27 Sept 2023 to 26 Mar 2027 |
| Location |
The Float @ Marina Bay |
| Crafts |
SR3554H (Crane Barge), SR4007Z (Crane Barge), SR3589J (Tug Boat), RC413 (Tug Boat), RC 972 and SR3861Z (Workboat/Safety Boat), RC974 (working Platform) |
| Time |
0000 hrs-2359 hrs |
| Contact |
Asher Lum @ 9009 75079009 7507 Terrence Chan @ 9854955598549555 (MTC) |
Expand Construction Pte Ltd is appointed by Defence Science & Technology Agency to construct the NS Square at Marina Bay. Marina Technology and Construction Pte Ltd (MTC) is the appointed Marine Specialist for the Marine Works. The Works will include the demolition of the existing floating platform, the installation of cofferdam, construction of new building, access bridges and pontoons, and the removal cofferdam & its associated construction equipment/plants. Table 1 shows the Construction Project Schedule.
Refer to the attached drawing Figure 1 for the Master Site Plan. The limits of the construction boundaries, where vessels are required to keep clear, are defined by Navigation Buoys with respective navigation lights Buoy 1 & Buoy 2 at Working Area A as shown on Figure 2, and Buoy A & Buoy B at Working Area B as shown on Figure 3.
All vessels are advised to keep clear of the construction boundaries and reduce to a speed of 5 knots while passing through the Temporary Navigation Buoys during the project duration.
Table 1
Construction Project Schedule
| Start Date |
End Date |
Work Description |
| Month 1 (27 Sep 2023) |
Month 2 (26 Nov 2023) |
Mobilise machinery, plants and equipment, marine boreholes, and marine survey works |
| Month 3 (27 Nov 2023) |
Month 10 (26 Jul 2024) |
Removal of Floating Platform & Construction of Cofferdam |
| Month 11 (27 Jul 2024) |
Month 30 (26 Mar 2026) |
Construction of New Building and associated Marine Structures |
| Month 31 (27 Mar 2026) |
Month 38 (26 Nov 2026) |
Removal of Cofferdam, Installation of Floating Pontoons, Facade and Architectural Works |
| Month 39 (27 Nov 2026) |
Month 42 (26 Mar 2027) |
Landscape and M&E Works, de-mobilise machinery, plants and equipment |
Table 2
Construction Work Boundary
Working Area A (Main Construction Site)
| Point |
Geographical Coordinates |
Buoy Characterstics |
Light Characteristics |
| Buoy 1 |
Lat 1° 17’15.97” N Long 103° 51’26.79” E |
Yellow |
Yellow Light with Flash 0.5 Sec on, 1.0 Sec Off |
| Buoy 2 |
Lat 1° 17’15.51” N Long 103° 51’37.00” E |
Yellow |
Yellow Light with Flash 0.5 Sec on, 1.0 Sec Off |
Working Area B (Marina Launching Site)
| Point |
Geographical Coordinates |
Buoy Characterstics |
Light Characteristics |
| Buoy A |
Lat 1° 17’57.30” N Long 103° 51’56.31” E |
Yellow |
Yellow Light with Flash 0.5 Sec on, 1.0 Sec Off |
| Buoy B |
Lat 1° 17’52.97” N Long 103° 51’53.3” E |
Yellow |
Yellow Light with Flash 0.5 Sec on, 1.0 Sec Off |
Figure 1 (Master Site Plan)
Location Plan of Working Area A & B

Figure 2 (Blown Up)
Working Area A - Main Construction Site

Figure 3 (Blown Up)
Working Area B - Marine Launch Site

![]() |
![]() |
| SR 4007Z |
SR3554H |
![]() |
![]() |
| SR3589J |
RC 413 |
![]() |
![]() |
| SR3861Z |
RC 972 |
![]() |
|
| RC 974 |