Overview

Date of Notice
25 September 2023
Period Of Work
11 October 2023 to 31 October 2023
Time
0800Hrs to 1700Hrs
Location
Tg Rhu Road / Indoor Stadium / Geylang River (Tg Rhu Suspension Bridge)
Read Street / Singapore River (Read Bridge)

Craft
RZ57 Speed Boat
Contact
Mr. Tu Ching Hao 8223 57748223 5774 ([email protected]); 
Mr. Thushy 9721 36239721 3623 ([email protected]); 
Mr. Hazwan 9163 56579163 5657 ([email protected]);  
Ms. Richelle 9625 41299625 4129 ([email protected])

 

1. CMP Consultants Pte Ltd has been engaged by LTA to carry out minor road structure inspection work to pedestrian bridges at Ord Road / Singapore River (Ord Bridge), Tg Rhu Road / Indoor Stadium / Geylang River (Tg Rhu Suspension Bridge) and Read Street / Singapore River (Read Bridge) from 11 October 2023 to 31 October 2023. Please refer to the table below for the schedule of works and activities.

 

Activities Start date / Time End date / Time
Mobilisation of speed boat 0800hrs of every day 0800hrs of every day
Structural inspection work
11 October 2023 / 0800hrs
31 October 2023 / 1700hrs
De-mobilisation of speed boat
1645hrs of every day
1645hrs of every day

Location of Works - Ord Road / SIngapore River (Ord Bridge)

Location of Works - Tg Rhu Road / Indoor Stadium / Geylang River (Tg Rhu Suspension Bridge)

Location of Works - Read Street / Singapore River (Read Bridge)

2. During working day, RZ57 speed boat will be operated by trained personnel, fetching structural inspectors from CMP Consultants Pte Ltd towards the said bridges.

Photo of RZ57 speed boat (RZ58 is similar to RZ57)

3. Beneath the bridge, the speed boat will move around in low speed fetching structural inspectors, to ensure the entire bridge soffit and abutments are inspected.

4. After completion of daily work, the speed boat will return to the approved dock at Kallang Water Sports Centre. There will be nothing left over from CMP Consultants Pte Ltd.

5. Beneath All vessels are advised to keep clear of the inspection work areas and slow down when in the vicinity.