1. There will be pontoon installation and removal works in Kallang Basin and Marina Bay from 25 Jan to 2 Feb 2024. Please refer to the table below for the schedule of works and the location maps here.
2. Safety lines using line of floats and red colour buoys with flashing lights will be installed from 26 Jan 2024. These will mark the borders indicating the NO-ENTRY ZONES. All vessels are advised not to trespass into the NO-ENTRY ZONES and to ply strictly within the navigational route as set out in Map 2.
3. All vessels are to comply with the instructions/ directions given by the safety/work boats’ crew.
| Date | Time |
Activities | Safety Remarks |
|---|---|---|---|
| 25 January 2024 | 0700hrs to 1900hrs | Craning Operations (Unloading of pontoons/cubis system from lorry crane to Kallang Basin near Ducktours splash point. Configuration of pontoons/cubis system at Kallang Basin near Ducktours splash point. |
All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) |
| 26 to 28 January 2024 |
0700hrs to 1900hrs |
Setup works (installation of platform, lightings and filming equipment) |
All vessels are to keep clear of setup areas. (Refer to Map 1) |
| 29 January 2024 |
0700hrs to 1700hrs |
Towing of pontoons/cubis system from Kallang Basin to Marina Channel. Anchoring works. |
All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) |
| 29 January 2024 |
1600 hrs to 2100hrs |
Filming activities in the vicinity of cordoned area |
All vessels are to keep clear of the safety lines. |
| 30 January 2024 |
0700hrs to 1900hrs |
Towing of pontoons/cubis system from Marina Channel back to Kallang Basin near Ducktours splash point for pontoon dismantle works. |
All vessels are to keep a wide berth to the towing operations and keep clear of tear down areas. (Refer to Map 1) |
| 31 Jan to 2 Feb 2024 |
0900hrs to 1900hrs |
Pontoon dismantle works. Craning operation to remove pontoon/ cubis system back to storage. |
All vessels are to keep clear of tear down areas. |