| Date of Notice | 21 February 2024 |
|---|---|
| Period of Works | 22 Feb 2024 - 31 Dec 2026 |
| Location |
Under Benjamin Sheares Bridge, next to Pier nearest to shore on Flyer side |
| Crafts | RC 496 (Floating Site Office) RC 3518A (Passenger Boat), RC972 (Workboat/Safety Boat) |
| Time |
0000hrs - 2359 hrs |
| Contact | Asher Lum @ 9009 7507; Terrence Chan @ 98549555 (MTC) |
Expand Construction Pte Ltd is appointed by Defense Science & Technology Agency to construct the NS Square at Marina Bay. Marina Technology and Construction Pte Ltd (MTC) is the appointed Marine Specialist for the Marine Works.
This notice is to inform on the installation, operation and de-mobilisation of the Floating Site Office, which is to be installed for the support the works of NS Square Construction.
There shall be yellow blinker lights at the 2 extreme corners of the Floating Site Office to demarcate the location of the Floating Site Office during the night.
All vessels are advised to keep clear of the floating site office demarcated by blue buoys and yellow blinker lights, and reduce to a speed of 5 knots while passing by the Floating Site Office during the project duration.
Table 1 shows the Work Schedule.
Table 1
Work Schedule
| Start Date | End Date | Work Description |
|---|---|---|
| 22 Feb 2024 | 21 Mar 2024 | Installation of Floating Site Office |
| 22 Mar 2024 | 30 Nov 2026 | Operation of Floating Site Office |
| 1 Dec 2026 | 31 Dec 2026 | Removal of Floating Site Office |
Table 2
Location of Floating Site Office
| Point |
Point Geographical Coordinates |
Buoy Characteristic | Light Characteristics |
|---|---|---|---|
| Binker Light 1 | Lat 1o 17’17.73” N Long 103o 51’41.10” E |
Yellow | Yellow Light with Flash 0.5 Sec on, 1.0 Sec off |
| Blinker Light 2 | Lat 1o 17’17.70” N Long 103o 51’42.25” E |
Yellow | Yellow Light with Flash 0.5 Sec on, 1.0 Sec off |
Figure 1
Location Map – NS Square Development Site & Floating Site Office

Figure 2
Artistic Impression of Floating Site Office