Date and Time Refer to schedule below
Location Kallang Basin and Marina Channel
Craft RZ 073/ RZ064 and RZ078/ RZ079 (work boats/ safety boats)
Contact
Rex Aw (PA)
[email protected]

Adam Tan (Glorious Singapore Pte Ltd)
[email protected] 

Kwek Teck Kee (Glorious Singapore Pte Ltd)
[email protected]


1. Marina Channel will be partially closed to all water traffic for the Chingay 2024 fireworks displays on 23 and 24 Feb 2024, from 2000 hrs to 2300 hrs. All vessels are to keep clear of the safety radius and stay behind the safety boats. All vessels are advised to comply with the instructions and directions given by the safety boats’ crew. Please refer to the Maps 1 to 3 given here. 

2. All vessels are to keep clear of the water barricades at Marina Channel and ply outside the water barricades at all times, during non-closure period.

Installation/removal works and Loading of Fireworks on Pontoons

3. There will be installation and removal works at the Kallang Basin (Republic Ave) and Marina Channel from 14 to 28 Feb 2024. Please refer the Table below for the schedule of works.


Date Time
Activities Safety Remarks
14 to 16 Feb 1000 – 1800hrs Towing pontoons/ Cubi system from WWS to Kallang Basin (Republic Ave) and set up works. 
Craning ops at Kallang Basin (Republic Ave)

Configuration of cubi and pontoons at Kallang Basin (Republic Ave)
All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map 1)
17 to 19 Feb
1000 – 1800hrs

Towing of pontoons/ Cubi system from Kallang Basin (Republic Ave) to Marina Channel for positioning and anchoring.

Safety water barricades using floats lines, red buoys with flashing lights and no-entry signs will be installed. These will mark the borders indicating the NO-ENTRY ZONES.

All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map 1, 2, 3)

All vessels must not trespass into the NO-ENTRY ZONES and to ply outside the safety water barricades and within the navigational route as per Map 2.
19 to 20 Feb
1000 – 1900hrs
Transferring / towing of fireworks from Republic Ave to Marina Channel for installation process.
All vessels are to keep a wide berth to the towing operations and keep clear of set-up areas. (Refer to Map 1)
25 to 27 Feb
1000 – 1800hrs
Removal of floats lines, red buoys with flashing lights and no-entry signs at Marina Channel. De-installation of pontoons.

Towing of pontoons/ Cubi system from Marina Channel back to Kallang Basin (Republic Ave) for dismantling.

Recovery craning ops at Kallang Basin (Republic Ave).
All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map 1, 2, 3)
27 to 28 Feb
1000 – 1800hrs
Towing pontoons/ Cubi system back to WWS from Kallang Basin (Republic Ave). Works at Republic Ave.
All vessels are to keep clear of the tear-down areas. (Refer to Map 1)