sg-crest
A Singapore Government Agency Website
 
Official website links end with .gov.sg
 
Secure websites use HTTPS
Look for a lock () or https:// as an added precaution. Share sensitive information only on official, secure websites.

About Us Careers
Industry
Tenders & Contracts
Upcoming Tenders eGuarantee@Gov
e-Services
Resources
Resources
Gallery Publications

RESERVOIR NOTICE

Installation and Removal works for Fireworks Display and Closure timings at Marina Bay for National Day Parade 2024

 

Date of Notice

24 May 2024

Date of Works

28 May to 22 August 2024

(Refer to schedule below)

Location

Marina Reservoir, Kallang Basin, Marina Channel, and Marina Bay

Crafts

RZ92, RZ57, PCG boats, SAF General Support Boats, M3G Vessels, RHIBs, Cordon boats

Contact Person

Huang Yong Sheng, NDP 2024 FW Committee

[email protected]

 

Samson Phua (Intermay Consultech Pte Ltd)

[email protected]

 

Roy Lim (Intermay Consultech Pte Ltd)

r[email protected]

 

1.            Marina Bay will be closed to all water traffic for the National Day Parade (NDP) 2024 shows and fireworks displays on NDP rehearsals, previews and actual day.

 

2.            Marina Bay will be closed between the Jubilee Bridge and Helix Bridge during the dates and times specified in Table 2 and Map 4. Two safety boats will be present at each closing limit to enact these closures. All vessels are not to cross the safety boats limit and follow the instructions and directions given by the safety boats’ crew. Please refer to the location maps here for the towing and water traffic plans.

 

Table 2: Closure of Marina Bay to all Water Traffic

 

Date

Event

Closure time

15 June

CR1

1730 hrs to 2100 hrs

22 June

CR2

29 June

NE1

6 July

NE2

13 July

NE3

20 July

NE4

27 July

Preview 1

1730 hrs to 2200 hrs

3 August

Preview 2

9 Aug

NDP 2024

 

Installation works and Loading of Fireworks on Pontoons

3.            There will be installation and removal works at the Kallang Basin (Republic Ave) and Marina Bay from 28 May to 22 Aug 2024. Please refer Table 3 below for the schedule of works and attached location maps.

 

Table 3: Details of Works at Kallang Basin and Marina Bay

 

Date

Time

Activities

Safety Remarks

28 May to 5 June 2024

0700hrs to

1800hrs

Craning Ops at Kallang Basin (Republic Ave)

 

Configuration of cubis and pontoons at Kallang Basin (Republic Ave)

 

 

All vessels are to keep clear of setup areas.

(Refer to Map 1).

6 June 2024

 

(*Reserve date 7 June 2024)

0700 – 1800hrs

Towing of pontoons/ Cubi system from Kallang Basin (Republic Ave) to Marina Bay for positioning and anchoring.

 

Safety lines using line of floats and red buoys with flashing lights and no-entry signs will be installed.

 

*Reserve date for towing ops

All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map 1)

 

12 June,

19 June,

26 June,

3 July,

10 July,

17 July,

24 July,

31 July,

6 August

 

(*Reserve date 13, 20, 27 June; 4, 11, 18, 25 July; 1 August and 7 August)

1000 – 1800hrs

Transferring / towing of Mid cum high level fireworks from Kallang Sea Sports Training Center to Marina Bay for installation process.

 

 

 

 

 

 

 

 

 

*Reserve date for transferring/ towing ops

All vessels are to keep a wide berth to the towing operations and keep clear of set-up areas. (Refer to Map 2)

12 to 15 June,

19 to 22 June, 26 to 29 June, 3 to 6 July, 10 to 13 July, 17 to 20 July, 24 to 27 July, 31 July to 3 Aug and 6 to 9 Aug

1000 – 2000hrs

Mid cum high level fireworks installation work in progress at Marina Bay site.

 

 

 

Fireworks on site.

All vessels are to keep a wide berth to the towing operations and keep clear of setup areas.

 

All vessels are to follow the navigational route in Map 3

 

 

10 – 14 Aug

 

(*Reserve date 15 Aug)

0700 – 1800hrs

Removal of safety lines, red buoys and no-entry signs at Marina Bay. De-installation of pontoons.

 

Towing of pontoons/ Cubi system from Marina Bay back to Kallang Basin (Republic Ave) for dismantling.

 

*Reserve date for towing ops

All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map 1)

14 to 21 August

 

(*Reserve date 22 Aug)

0700 – 1800hrs

Dismantling works at Republic Ave.

 

Recovery craning ops at Kallang Basin (Republic Ave).

 

*Reserve date for craning ops

All vessels are to keep clear of the tear-down areas. (Refer to Map 1)

 

Safety Measures

 

4.              From 6 June onwards, there will be anchoring and setting up of the safety radius using line of floats, red buoys and no-entry signs with flashing lights in Marina Bay. These will mark the borders indicating the NO-ENTRY ZONES.

 

5.             All vessels are advised not to trespass into the NO-ENTRY ZONES and to ply strictly within the navigational route as set out in the maps. When entering and leaving the Marina Bay, all vessels are to keep clear of the safety radius by skirting the perimeter outside the line of floats AT ALL TIMES.