sg-crest
A Singapore Government Agency Website
 
Official website links end with .gov.sg
 
Secure websites use HTTPS
Look for a lock () or https:// as an added precaution. Share sensitive information only on official, secure websites.

About Us Careers
Industry
Tenders & Contracts
Upcoming Tenders eGuarantee@Gov
e-Services
Resources
Resources
Gallery Publications

Reservoir Notice

 

Date of Notice

13 Dec 2024

Period of works

18 Dec 2024 to 7 Jan 2025

Location

Marina Reservoir – Kallang Basin

Craft

RZ 64, SR 3876H, RZ 073 (work boats/ safety boats)

Contact Person

Kevin Chan (Kallang Alive Sports Management)

[email protected]

 

Adam Tan (Explomo Corporation Pte Ltd)

[email protected]

 

Kwek Teck Kee (Explomo Corporation Pte Ltd)

[email protected]

 

 

 

1.            Part of Kallang Basin will be closed to all water traffic for the NYE Countdown fireworks displays from 31 Dec 2024, 2000 hrs to 1 Jan 2025, 0200 hrs. The closure limits are between the Fountain area, Merdeka Bridge and Tanjong Rhu Suspension Footbridge. Security boats will be present at the closure area. All vessels are not to enter closure area and follow the instructions and directions given by the security boats’ crew. Please refer to Map 3.

 

2.         All vessels are to ply strictly within the navigational routes as set out in the Map 2 from 23 Dec 2024 to 3 Jan 2025.

 

Installation/removal works and Loading of Fireworks on Pontoons

 

3.            There will be installation and removal work at the Kallang Basin and Republic Ave (Toilet B area) from 18 Dec 2024 till 7 Jan 2025. Please refer the Table below for the schedule of works and location maps here.

 

Date

Time

Activities

Safety Remarks

18 – 23 Dec 2024

1000 – 1800hrs

Towing pontoons/ Cubi system from WWS to Kallang Basin (Republic Ave) and set up works.

 

Craning ops at Kallang Basin (Republic Ave).

 

Configuration of cubi and pontoons at Kallang Basin (Republic Ave).

 

All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map 1)

23 – 24 Dec 2024

1000 – 1800hrs

Towing of pontoons/ Cubi system from Republic Ave to firing site at Kallang Basin for positioning and anchoring.

 

Safety water barricades using floats lines, red buoys with flashing lights and no-entry signs will be installed. These will mark the borders indicating the NO-ENTRY ZONES.

 

All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map 1 and 2)

 

All vessels must not trespass into the NO-ENTRY ZONES and to ply strictly within the navigational route as set out in Map 2.

 

26, 27 Dec 2024

1000 – 1900hrs

Transferring / towing of fireworks from Republic Ave to Kallang Basin for installation process.

 

 

All vessels are to keep a wide berth to the towing operations and keep clear of set-up areas. (Refer to Map 1)

 

31 Dec 2024

1000 – 1800hrs

The firing control pontoon will be separated from main pontoon and tow into firing position.

All vessels are to keep a wide berth to the towing operations and keep clear of set-up areas. (Refer to Map 3)

 

2 – 6 Jan 2025

1000 – 1800hrs

Removal of floats lines, red buoys with flashing lights and no-entry signs at Kallang Basin. De-installation of pontoons.

 

Towing of pontoons/ Cubi system from Kallang Basin back to Republic Ave for dismantling.

 

Recovery craning ops at Kallang Basin (Republic Ave).

 

All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map 1 and 2)

6 - 7 Jan 2025

1000 – 1800hrs

Towing pontoons/ Cubi system back to WWS from Kallang Basin (Republic Ave). Works at Republic Ave.

 

All vessels are to keep clear of the tear-down areas. (Refer to Map 1)