sg-crest
A Singapore Government Agency Website
 
Official website links end with .gov.sg
 
Secure websites use HTTPS
Look for a lock () or https:// as an added precaution. Share sensitive information only on official, secure websites.

About Us Careers
Industry
Tenders & Contracts
Upcoming Tenders eGuarantee@Gov
e-Services
Resources
Resources
Gallery Publications

RESERVOIR NOTICE

 

Date of Notice

3 January 2025

Date of Works

8 January to 17 February 2025

(Refer to schedule below)

Time

0900hrs to 1800hrs

Location

Marina Reservoir (Kallang Basin and Marina Channel)

Craft

RZ92, RZ57, RZ15, SZ15477C and RC475 (Work boats/Safety boats)

Contact Person

Rex Aw (PA)

[email protected]

 

Samson Phua (Intermay Consultech Pte Ltd)

[email protected]

 

1.    Marina Channel will be partially closed to all water traffic for the Chingay 2025 fireworks displays on 7 and 8 Feb 2025, from 2000 hrs to 2300 hrs. All vessels are to keep clear of the safety radius and stay behind the safety boats. All vessels are advised to comply with the instructions and directions given by the safety boats’ crew. Please refer to the Maps 1 to 3 given here.

 

2.    All vessels are to keep clear of the water barricades at Marina Channel and ply outside the water barricades at all times, during non-closure period.

 

Installation/removal works and Loading of Fireworks on Pontoons

 

3.    There will be installation and removal works at the Kallang Basin (Republic Ave) and Marina Channel from 8 Jan to 17 Feb 2025. Please refer the Table below for the schedule of works.

 

Date

Time

Activities

Safety Remarks

8 to 20 Jan 2025

0900hrs-1800hrs

Craning ops at Kallang Basin (Republic Ave)

 

Configuration of cubi and pontoons at Kallang Basin (Republic Ave)

All vessels are to keep clear of set up areas. (Refer to Map 1)

20 to 21 Jan 2025

0900hrs-1800hrs

Towing of pontoons/ Cubi system from Kallang Basin (Republic Ave) to Marina Channel for positioning and anchoring.

 

Safety water barricades using floats lines, red buoys with flashing lights and no-entry signs will be installed. These will mark the borders indicating the NO-ENTRY ZONES.

All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map 1, 2, 3)

 

All vessels must not trespass into the NOENTRY ZONES and to ply outside the safety water barricades and within the navigational route as per Map 2.

2 to 3 Feb 2025

0900hrs-1800hrs

Transferring / towing of fireworks from Republic Ave to Marina Channel for installation process.

All vessels are to keep a wide berth to the towing operations and keep clear of set-up areas. (Refer to Map 1)

9 to 10 Feb 2025

0900hrs-1800hrs

Removal of floats lines, red buoys with flashing lights and no-entry signs at Marina Channel. De-installation of pontoons.

 

Towing of pontoons/ Cubi system from Marina Channel back to Kallang Basin (Republic Ave) for dismantling.

 

Recovery craning ops at Kallang Basin (Republic Ave).

All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map 1, 2, 3)

11 to 17 Feb 2025

0900hrs-1800hrs

De-Installation of pontoons at Kallang Basin (Republic Ave).

 

Craning operations to remove pontoon and cubis system back to storage.

All vessels are to keep clear of the tear-down areas. (Refer to Map 1)