Reservoir Notice

 

Date of Notice

7 April 2025

Date of Works

8 to 19 April 2025

Time

0700hrs to 1900hrs

Location

Marina Reservoir, Marina Bay (Bayfront)

Crafts

RC413 (Work Boat)

SR3861Z (Safety Boat)

RC263 (Raft Pontoon)

Contact Person

Marina Technology and Construction Pte Ltd

Terrence Chan - 9854 9555

 

  1. Marina Technology and Construction Pte Ltd (MTC) is the appointed contractor for the installation of modular pontoon at Passion Wave Outpost @ Bayfront.

     

  2. A modular pontoon consisting of 1 primary pontoon and 3 fingers are to be constructed at the Passion Wave at Bayfront along an existing aluminium pontoon for the berthing of dragon boats and rescue boats.

     

  3. All vessels are advised to keep clear of the working boundaries and reduce to a speed of 5 knots while passing through the Temporary Navigation Buoys during the duration.

     

  4. Table 1 shows the Installation of Modular Pontoon Schedule.

     

    Table 1

    Installation of Modular Pontoon Schedule



  5. Table 2

    Working Boundary

    Figure 1

    Location Plan of Working Area A

     

  6. Towing Route: