Installation and Removal works for F1 2025 SG60 LED Platform
|
Date and Time |
Refer to schedule below
|
|
Location |
Kallang Basin, Marina Channel, and Marina Bay
|
|
Craft |
RZ100, RZ57, SZ 15477C
|
|
Contact |
Samson Phua (Intermay Consultech Pte Ltd)
Roy Lim (Intermay Consultech Pte Ltd)
|
1. There will be installation and removal works at the Kallang Basin (Republic Ave) and Marina Bay from 1 September 2025 to 16 October 2025. Please refer Table 1 for the works schedule and map for details.
Table 1: Details of Works at Kallang Basin and Marina Bay
|
Date |
Time |
Activities |
Safety Remarks |
|
01/09/2025 to 17/09/2025 |
0700hrs to 1900hrs |
Craning Ops at Kallang Basin (Republic Ave).
Configuration of cubis and pontoons at Kallang Basin (Republic Ave).
|
All vessels are to keep clear of setup areas. (Refer to Map) |
|
17/09/2025
(*Reserve date 18/09/2025) |
0700hrs to 1900hrs |
Towing of pontoons/ Cubi system from Kallang Basin (Republic Ave) to Marina Bay for positioning and anchoring.
Safety lines using lines of floats and buoys with flashing lights and no-entry signs will be installed. These will mark the borders indicating the NO-ENTRY ZONE.
*Reserve date for towing ops
|
All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map)
|
|
19/09/2025 to 05/10/2025 |
0700hrs to 2300hrs |
Show preparation, rehearsal and show dates.
|
All vessels are to keep clear of No-entry zone. (Refer to Map) |
|
06/10/2025
(*Reserve date 07/10/2025) |
0700 – 1900hrs |
Removal of safety lines, buoys and no-entry signs at Marina Bay. De-installation of pontoons.
Towing of pontoons/ Cubi system from Marina Bay back to Kallang Basin (Republic Ave) for dismantling.
*Reserve date for towing ops
|
All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map) |
|
06/10/2025 to 16/10/2025 |
0700 – 1900hrs |
Dismantling works and recovery craning ops at Kallang Basin (Republic Ave).
|
All vessels are to keep clear of the tear-down areas. (Refer to Map)
|
Safety Measures
2. From 18 September onwards, there will be anchoring and setting up of the barricaded area using lines of floats, buoys with flashing lights and no-entry signs in Marina Bay (off Esplanade Outdoor Theatre). These will mark the borders indicating the NO-ENTRY ZONE.
3. All vessels are advised not to trespass into the NO-ENTRY ZONE and to ply outside the safety lines at all times.