Date of Event

Start date: 7 September 2026

End date: 24 October 2026

Refer to schedule below

Time

Refer to schedule below

Location

Marina Reservoir (Kallang Basin)

Crafts

RC413, SR3154B, SR3861Z (Work Boat) and SR3589J

Contact Person

Silvere @ 9878 9164 (MTC)

 

  1. There will be installation and removal works of F1 2026 gangways and pontoons at the Kallang Basin from 7 September 2026 to 24 October 2026. Please refer Table 1 below for the schedule of works and attached location maps.

     

  2. All vessels are advised not to trespass into the set-up area and to comply strictly within the navigational route as set out in the maps.

Table 1: Details of Works at Kallang Basin

Date

Time

Activities

Safety Remarks

07/09/2026 to 14/09/2026

0700hrs to

1900hrs

Craning Ops at Kallang Basin

 

Configuration of cubi system/ pontoons at launching area.

 

Installation of sinkers.

 

All vessels are to keep clear of setup areas.

(Refer to Map)

15/09/2026

to 21/09/2026

0700hrs to 1900hrs

Towing of pontoons/ Cubi system from launching area to set-up area (demarcated by Buoys C and D) for positioning and anchoring.

 

Buoys with flashing yellow lights will be installed.

 

All vessels are to keep a wide berth to the towing operations and keep clear of set up areas. (Refer to Map)

 

22/09/2026 to 08/10/2026

0700hrs to 2300hrs

Setting up of gangways and pontoons at set-up area.

 

All vessels are to keep clear of setup areas.

(Refer to Map)

 

12/10/2026

to 28/10/2026

0700 – 1900hrs

Removal of buoys and de-installation of pontoons.

 

Towing of pontoons/ Cubi system from set-up area back to launching area for dismantling.

 

All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map)

 

 

 

 

 

 

 

 

Point

Latitude

Longitude

Buoyant Color

Light Characteristics

Marker Buoy A

1o17'55.52" N

103o51'54.44" E

Yellow

Yellow Light with Flash. 0.5 sec on, 1 sec off

Marker Buoy B

1o17'52.55" N

103o51'52.91" E

Yellow

Yellow Light with Flash. 0.5 sec on, 1 sec off

Launching area

 

Point

Latitude

Longitude

Buoyant Color

Light Characteristics

Marker Buoy C

1o17'47.11" N

103o51'52.96" E

Yellow

Yellow Light with Flash. 0.5 sec on, 1 sec off

Marker Buoy D

1o17'40.95" N

103o51'53.91" E

Yellow

Yellow Light with Flash. 0.5 sec on, 1 sec off

Set-up area