Sign In
True

​​​

Marina Barrage Notices

 

 

Bridge Closure for Maintenance545https://www.pub.gov.sg/marinabarrage/notices/2022Notice78Bridge Closure for Maintenance6/5/2023 4:00:00 PM6/6/2023 4:00:00 PMBridge-Closure-for-Maintenance-06June2023.aspx
Temporary Restricted Area (TRA) for Aerial Activities at Marina Barrage549https://www.pub.gov.sg/marinabarrage/notices/2022Notice81Temporary Restricted Area (TRA) for Aerial Activities at Marina Barrage6/5/2023 4:00:00 PM8/11/2023 4:00:00 PMTemporaryRestrictedArea-TRA-AerialActivities-MarinaBarrage-31052023.aspx
Towing of vessels and pontoons from Clarke Quay to Kallang Riverside Park and removal of piles at Clark Quay.548https://www.pub.gov.sg/marinabarrage/notices/2022Notice80Towing of vessels and pontoons from Clarke Quay to Kallang Riverside Park and removal of piles at Clark Quay.6/4/2023 4:00:00 PM9/21/2023 4:00:00 PMTowing-of-vessels-and-pontoons-from-Clarke-Quay-to-Kallang-Riverside-Park-and-removal-of-piles-at-Clark-Quay.aspx
2023 Singapore Sprint Cup546https://www.pub.gov.sg/marinabarrage/notices/2022Notice792023 Singapore Sprint Cup6/2/2023 4:00:00 PM6/3/2023 4:00:00 PMReservoirNotice_SCF_26May2023.aspx
LTA CONTRACT TR271E- PRINCIPAL INSPECTION OF ELGIN, ESPLANADE & MERDEKA BRIDGES AT SINGAPORE RIVER/ MARINA RESERVOIR/ KALLANG RIVER544https://www.pub.gov.sg/marinabarrage/notices/2022Notice77LTA CONTRACT TR271E- PRINCIPAL INSPECTION OF ELGIN, ESPLANADE & MERDEKA BRIDGES AT SINGAPORE RIVER/ MARINA RESERVOIR/ KALLANG RIVER5/28/2023 4:00:00 PM5/29/2023 4:00:00 PMLTA-CONTRACT-TR271E--PRINCIPAL-INSPECTION-OF-ELGIN,-ESPLANADE-&-MERDEKA-BRIDGES-AT-SINGAPORE-RIVER-MARINA-RESERVOIR-KALLANG.aspx
Installation and Removal works for Fireworks Display and Closure timings at Marina Bay for National Day Parade 2023543https://www.pub.gov.sg/marinabarrage/notices/2022Notice76Installation and Removal works for Fireworks Display and Closure timings at Marina Bay for National Day Parade 20235/21/2023 4:00:00 PM8/21/2023 4:00:00 PMInstallation-and-Removal-works_FireworksDisplay_ClosureTimings_Marina-Bay_NDP2023_1805.aspx
Pipe-laying Works at Marina Barrage Drop-Off Area (West Entrance)542https://www.pub.gov.sg/marinabarrage/notices/2022Notice75Pipe-laying Works at Marina Barrage Drop-Off Area (West Entrance)5/15/2023 4:00:00 PM5/30/2023 4:00:00 PMPipe-laying-Works-at-Marina-Barrage-Drop-Off-Area-West_Entrance15052023.aspx
Bech Bruun Match Race Event 2023541https://www.pub.gov.sg/marinabarrage/notices/2022Notice74Bech Bruun Match Race Event 20235/10/2023 4:00:00 PM5/15/2023 4:00:00 PMBech-Bruun-Match-Race-Event-2023.aspx
Fire Drill At Marina Barrage540https://www.pub.gov.sg/marinabarrage/notices/2022Notice73Fire Drill At Marina Barrage5/3/2023 4:00:00 PM5/3/2023 4:00:00 PMFire-Drill-At-Marina-Barrage170423.aspx
REMOVAL AND LIFTING OF PONTOON UNDER BENJAMIN SHEARS BRIDGE536https://www.pub.gov.sg/marinabarrage/notices/2022Notice69REMOVAL AND LIFTING OF PONTOON UNDER BENJAMIN SHEARS BRIDGE4/23/2023 4:00:00 PM4/26/2023 4:00:00 PMREMOVAL-AND-LIFTING-OF-PONTOON-UNDER-BENJAMIN-SHEARS-BRIDGE.aspx
Bridge Closure for Maintenance539https://www.pub.gov.sg/marinabarrage/notices/2022Notice72Bridge Closure for Maintenance4/16/2023 4:00:00 PM4/19/2023 4:00:00 PMBridge-Closure-for-Maintenance1701032023.aspx
Bridge Closure for Maintenance538https://www.pub.gov.sg/marinabarrage/notices/2022Notice71Bridge Closure for Maintenance3/29/2023 4:00:00 PM3/30/2023 4:00:00 PMBridge-Closure-for-Maintenance201032023.aspx
CONCRETE REPAIR WORK TO VEHICULAR BRIDGE AT EU TONG SEN STREET/ COLEMAN BRIDGE537https://www.pub.gov.sg/marinabarrage/notices/2022Notice70CONCRETE REPAIR WORK TO VEHICULAR BRIDGE AT EU TONG SEN STREET/ COLEMAN BRIDGE3/19/2023 4:00:00 PM4/21/2023 4:00:00 PMCONCRETE-REPAIR-WORK-TO-VEHICULAR-BRIDGE-AT-EU-TONG-SEN-STREET-COLEMAN-BRIDGE.aspx
SPALLING CONCRETE AND CRACK REPAIR WORKS ON VERTICAL WALL AND CEMENT POINTING WORKS ON ROCK REVETMENT AT KALLANG BASIN (NEAR TO MERDEKA BRIDGE)535https://www.pub.gov.sg/marinabarrage/notices/2022Notice68SPALLING CONCRETE AND CRACK REPAIR WORKS ON VERTICAL WALL AND CEMENT POINTING WORKS ON ROCK REVETMENT AT KALLANG BASIN (NEAR TO MERDEKA BRIDGE)3/5/2023 4:00:00 PM8/7/2023 4:00:00 PMSPALLINGCONCRETEREPAIRWORK_ROCKREVETMENT_KALLANGBASIN24022023.aspx
Bridge Closure for Maintenance533https://www.pub.gov.sg/marinabarrage/notices/2022Notice66Bridge Closure for Maintenance2/27/2023 4:00:00 PM2/28/2023 4:00:00 PMBridge-Closure-for-Maintenance-17022023.aspx
Pipe Replacement Works And Courtyard Toilets Closure534https://www.pub.gov.sg/marinabarrage/notices/2022Notice67Pipe Replacement Works And Courtyard Toilets Closure2/26/2023 4:00:00 PM2/28/2023 4:00:00 PMPipe-Replacement-Works-And-Courtyard-Toilets-Closure24032022.aspx
Enhancement Works outside the Sustainable Singapore Gallery532https://www.pub.gov.sg/marinabarrage/notices/2022Notice65Enhancement Works outside the Sustainable Singapore Gallery2/14/2023 4:00:00 PM3/13/2023 4:00:00 PMEnhancement-Works-outside-the-Sustainable-Singapore-Gallery.aspx
Bridge Closure for Maintenance531https://www.pub.gov.sg/marinabarrage/notices/2022Notice64Bridge Closure for Maintenance2/5/2023 4:00:00 PM2/8/2023 4:00:00 PMBridge-Closure-for-Maintenance-271123.aspx
Chingay 2023 Fireworks Setup and Removal Works and Water Closure Timings at Marina Channel (beside F1 Pit Building)530https://www.pub.gov.sg/marinabarrage/notices/2022Notice63Chingay 2023 Fireworks Setup and Removal Works and Water Closure Timings at Marina Channel (beside F1 Pit Building)1/25/2023 4:00:00 PM2/16/2023 4:00:00 PMChingay-2023-Fireworks-Setup-and-Removal-Works-and-Water-Closure-Timings-at-Marina-Channel-(beside-F1-Pit-Building).aspx
Closure of Sustainable Singapore Gallery on 25 Jan 2023526https://www.pub.gov.sg/marinabarrage/notices/2022Notice59Closure of Sustainable Singapore Gallery on 25 Jan 20231/24/2023 4:00:00 PM1/24/2023 4:00:00 PMClosure-of-Sustainable-Singapore-Gallery-on-25-Jan-2023.aspx
Chinese New Year Closure for Barrage Cove (2023)529https://www.pub.gov.sg/marinabarrage/notices/2022Notice62Chinese New Year Closure for Barrage Cove (2023)1/20/2023 4:00:00 PM1/20/2023 4:00:00 PMChinese-New-Year-Closure-for-Barrage-Cove-(2023).aspx
Lighting Repair and Maintenance Works at Various Locations Along Singapore / Geylang River525https://www.pub.gov.sg/marinabarrage/notices/2022Notice58Lighting Repair and Maintenance Works at Various Locations Along Singapore / Geylang River1/15/2023 4:00:00 PM1/15/2023 4:00:00 PMLightingRepairMaintenanceWorks-VariousLoc-GeylangRiver.aspx
2023 Singapore Canoe Marathon528https://www.pub.gov.sg/marinabarrage/notices/2022Notice612023 Singapore Canoe Marathon1/11/2023 4:00:00 PM1/15/2023 4:00:00 PM2023-Singapore-Canoe-Marathon.aspx
Bridge Closure for Maintenance527https://www.pub.gov.sg/marinabarrage/notices/2022Notice60Bridge Closure for Maintenance1/11/2023 4:00:00 PM1/17/2023 4:00:00 PMBridge-Closure-for-Maintenance_28122022.aspx
Star Island Countdown 2022/2023 Fireworks Set up and Removal works and Full Water Closure Timings at Marina Bay523https://www.pub.gov.sg/marinabarrage/notices/2022Notice56Star Island Countdown 2022/2023 Fireworks Set up and Removal works and Full Water Closure Timings at Marina Bay12/6/2022 4:00:00 PM1/13/2023 4:00:00 PMStarIslandCountdown20222023FireworksRemovalWorkFullWaterClosureTiming.aspx
REPLACING EXISTING BLUEBELL MEMBRANE AND PAINTING OF BLUEBELL AND GFRC LILIY PAD AND RECONSTRUCTION OF STAIRCASE & RAMP FOR READ BRIDGE AT 3 RIVER VALLEY ROAD (SINGAPORE PLANNING AREA)510https://www.pub.gov.sg/marinabarrage/notices/2022Notice43REPLACING EXISTING BLUEBELL MEMBRANE AND PAINTING OF BLUEBELL AND GFRC LILIY PAD AND RECONSTRUCTION OF STAIRCASE & RAMP FOR READ BRIDGE AT 3 RIVER VALLEY ROAD (SINGAPORE PLANNING AREA)10/6/2022 4:00:00 PM12/29/2023 4:00:00 PMREPLACING-EXISTING-BLUEBELL-MEMBRANE-AND-PAINTING-OF-BLUEBELL-ANG-GFRC-LILIY-PAD-AT-3-RIVER-VALLEY-ROAD-(SINGAPORE-PLANNING.aspx
Safe Management Measures at Marina Barrage450https://www.pub.gov.sg/marinabarrage/notices/2021Notice27Safe Management Measures at Marina Barrage4/25/2022 4:00:00 PM20210810Safe-Management-Measures.aspx
Level 1 Toilet Closure for Improvement Works477https://www.pub.gov.sg/marinabarrage/notices/2022Notice09Level 1 Toilet Closure for Improvement Works4/8/2022 4:00:00 PM7/30/2023 4:00:00 PMLevel1ToiletClosureImprovementWorks.aspx
Inspection of Floating Pontoon and Foreshore Structures at Promenade Extension455https://www.pub.gov.sg/marinabarrage/notices/2021Notice32Inspection of Floating Pontoon and Foreshore Structures at Promenade Extension10/3/2021 4:00:00 PM20210929Inspection-of-Floating.aspx
Revised Safe Management Measures at Marina Barrage (From 22 July 2021)444https://www.pub.gov.sg/marinabarrage/notices/2021Notice21Revised Safe Management Measures at Marina Barrage (From 22 July 2021)7/21/2021 4:00:00 PM20210721Revised-Safe-Management.aspx
Revised Safe Management Measures at Marina Barrage (From 15 July 2021)443https://www.pub.gov.sg/marinabarrage/notices/2021Notice20Revised Safe Management Measures at Marina Barrage (From 15 July 2021)7/13/2021 4:00:00 PM20210714Revised-Safe-Management.aspx
Revised Safe Management Measures at Marina Barrage (From 12 July 2021)442https://www.pub.gov.sg/marinabarrage/notices/2021Notice19Revised Safe Management Measures at Marina Barrage (From 12 July 2021)7/11/2021 4:00:00 PM20210708Revised-Safe-Management.aspx
Revised Safe Management Measures at Marina Barrage (From 21 June 2021)439https://www.pub.gov.sg/marinabarrage/notices/2021Notice16Revised Safe Management Measures at Marina Barrage (From 21 June 2021)6/17/2021 4:00:00 PM20210618REVISEDSMM.aspx
REVISED SAFE MANAGEMENT MEASURES AT MARINA BARRAGE (14 June 2021)438https://www.pub.gov.sg/marinabarrage/notices/2021Notice15REVISED SAFE MANAGEMENT MEASURES AT MARINA BARRAGE (14 June 2021)6/10/2021 4:00:00 PM20210611REVISED-SAFE-MANAGEMENT.aspx
Mandatory use of TraceTogether for SafeEntry check-ins429https://www.pub.gov.sg/marinabarrage/notices/2021Notice005Mandatory use of TraceTogether for SafeEntry check-ins5/4/2021 4:00:00 PM20210428Notice2.aspx
Extension to opening hours of Green Roof428https://www.pub.gov.sg/marinabarrage/notices/2021Notice004Extension to opening hours of Green Roof4/30/2021 4:00:00 PM20210428Notice1.aspx
Registration for Water Playground Entry with Effect from 11 Jan 2021415https://www.pub.gov.sg/marinabarrage/notices/RegistrationforWaterPlaygroundEntrywithEffectfrom11Jan2021Registration for Water Playground Entry with Effect from 11 Jan 20211/7/2021 4:00:00 PMRegistrationforWaterPlaygroundEntrywithEffectfrom11Jan2021.aspx
SUSTAINABLE SINGAPORE GALLERY GUIDED TOURS412https://www.pub.gov.sg/marinabarrage/notices/20201229SUSTAINABLESINGAPOREGALLERYGUIDEDTOURSSUSTAINABLE SINGAPORE GALLERY GUIDED TOURS12/28/2020 4:00:00 PMSUSTAINABLESINGAPOREGALLERYGUIDEDTOURS20201229.aspx
WATER PLAYGROUND OPENING HOURS413https://www.pub.gov.sg/marinabarrage/notices/20201229WATERPLAYGROUNDOPENINGHOURSWATER PLAYGROUND OPENING HOURS12/28/2020 4:00:00 PMWATERPLAYGROUNDOPENINGHOURS20201229.aspx
SAFE DISTANCING ADVISORY411https://www.pub.gov.sg/marinabarrage/notices/SafeDistancingAdvisory3SAFE DISTANCING ADVISORY12/15/2020 4:00:00 PMSAFE-DISTANCING-ADVISORY-3.aspx
Guided tours to resume at Sustainable Singapore Gallery405https://www.pub.gov.sg/marinabarrage/noticesGuided tours to resume at Sustainable Singapore Gallery11/16/2020 4:00:00 PMGuidedtourstoresumeatSustainableSingaporeGallery.aspx
REOPENING OF WATER PLAYGROUND406https://www.pub.gov.sg/marinabarrage/noticesREOPENING OF WATER PLAYGROUND10/26/2020 4:00:00 PMREOPENINGOFWATERPLAYGROUND.aspx
Project works at Kallang Basin and Marina Channel252https://www.pub.gov.sg/marinabarrage/notices/ProjectworksatKallangBasinandMarinaChannelProject works at Kallang Basin and Marina Channel7/23/2020 4:00:00 PMProjectworksatKallangBasinandMarinaChannel.aspx
REOPENING OF MARINA BARRAGE284https://www.pub.gov.sg/marinabarrage/notices/ReopeningOfMarinaBarrageREOPENING OF MARINA BARRAGE7/19/2020 4:00:00 PMReopeningOfMarinaBarrage.aspx
REOPENING OF SUSTAINABLE SINGAPORE GALLERY283https://www.pub.gov.sg/marinabarrage/notices/ReopeningOfSustainableSingaporeGalleryREOPENING OF SUSTAINABLE SINGAPORE GALLERY6/24/2020 4:00:00 PMReopeningOfSustainableSingaporeGallery.aspx
SAFE DISTANCING ADVISORY305https://www.pub.gov.sg/marinabarrage/notices/SAFEDISTANCEADVISORYSAFE DISTANCING ADVISORY6/16/2020 4:00:00 PMSafeDistanceAdvisory.aspx
REOPENING OF BARRAGE COVE280https://www.pub.gov.sg/marinabarrage/notices/ReopeningOfBarrageCoveREOPENING OF BARRAGE COVE6/16/2020 4:00:00 PMReopeningOfBarrageCove.aspx
Further closure of public amenities at Marina Barrage145https://www.pub.gov.sg/marinabarrage/notices/FurtherclosureofpublicamenitiesatMarinaBarrageFurther closure of public amenities at Marina Barrage4/16/2020 4:00:00 PMFurtherclosureofpublicamenitiesatMarinaBarrage.aspx
Temporary Closure of Barrage Cove364https://www.pub.gov.sg/marinabarrage/notices/TemporaryClosureofBarrageCoveTemporary Closure of Barrage Cove4/3/2020 4:00:00 PMTemporaryClosureofBarrageCove.aspx
Temporary Closure of Public Amenities at Marina Barrage 369https://www.pub.gov.sg/marinabarrage/notices/TemporaryClosureofPublicAmenitiesatMarinaBarrageTemporary Closure of Public Amenities at Marina Barrage 4/3/2020 4:00:00 PMTemporaryClosureofPublicAmenitiesatMarinaBarrage.aspx
Safe Distancing Advisory309https://www.pub.gov.sg/marinabarrage/notices/SafeDistancingAdvisorySafe Distancing Advisory3/24/2020 4:00:00 PMSafeDistancingAdvisory.aspx
Temporary Change of Operating Hours for Barrage Cove362https://www.pub.gov.sg/marinabarrage/notices/TemporaryChangeofOperatingHoursforBarrageCoveTemporary Change of Operating Hours for Barrage Cove3/23/2020 4:00:00 PMTemporaryChangeofOperatingHoursforBarrageCove.aspx
REGISTRATION OF UNMANNED AIRCRAFT270https://www.pub.gov.sg/marinabarrage/notices/RegistrationOfUnmannedAircraftREGISTRATION OF UNMANNED AIRCRAFT3/22/2020 4:00:00 PMRegistrationOfUnmannedAircraft.aspx
CORONAVIRUS DISEASE 2019 (COVID-19)234https://www.pub.gov.sg/marinabarrage/notices/NOVELCORONAVIRUSCORONAVIRUS DISEASE 2019 (COVID-19)2/10/2020 4:00:00 PMNOVELCORONAVIRUS.aspx
Closure of Water Playground77https://www.pub.gov.sg/marinabarrage/notices/Closureofwaterplayground2019Closure of Water Playground2/6/2020 4:00:00 PMClosureofwaterplayground2019.aspx
Zoning under Benjamin Sheares Bridge (across Kallang Basin)393https://www.pub.gov.sg/marinabarrage/notices/ZoningunderBenjaminShearesZoning under Benjamin Sheares Bridge (across Kallang Basin)4/17/2018 4:00:00 PMZoningunderBenjaminSheares.aspx
Capsize drill area in Marina Reservoir52https://www.pub.gov.sg/marinabarrage/notices/CapsizedrillareainMarinaReservoirCapsize drill area in Marina Reservoir2/21/2016 4:00:00 PMCapsizedrillareainMarinaReservoir.aspx
Extension of Water Taxi Services to Sports Hub Jetty129https://www.pub.gov.sg/marinabarrage/notices/ExtensionofWaterTaxiServicestoSportsHubJettyExtension of Water Taxi Services to Sports Hub Jetty1/13/2015 4:00:00 PMExtensionofWaterTaxiServicestoSportsHubJetty.aspx
Installation of Wind Station and Underwater Sensors182https://www.pub.gov.sg/marinabarrage/notices/InstallationofWindStationandUnderwaterSensorsInstallation of Wind Station and Underwater Sensors1/14/2014 4:00:00 PMInstallationofWindStationandUnderwaterSensors.aspx
Water Activities Zoning in Marina Reservoir386https://www.pub.gov.sg/marinabarrage/notices/WaterActivitiesZoninginMarinaReservoirWater Activities Zoning in Marina Reservoir5/2/2013 4:00:00 PMWaterActivitiesZoninginMarinaReservoir.aspx
Opening of Fishing Zones in Marina Reservoir244https://www.pub.gov.sg/marinabarrage/notices/OpeningofFishingZonesinMarinaReservoirOpening of Fishing Zones in Marina Reservoir11/26/2012 4:00:00 PMOpeningofFishingZonesinMarinaReservoir.aspx
Notice to Stakeholders For Compliance with PUB Reservoir Regulations235https://www.pub.gov.sg/marinabarrage/notices/NoticetoStakeholdersForCompliancewithPUBReservoirRegulationsNotice to Stakeholders For Compliance with PUB Reservoir Regulations10/7/2012 4:00:00 PMNoticetoStakeholdersForCompliancewithPUBReservoirRegulations.aspx
Sailing @ Marina Bay316https://www.pub.gov.sg/marinabarrage/notices/Sailing@MarinaBaySailing @ Marina Bay2/8/2012 4:00:00 PMSailing@MarinaBay.aspx
Mooring Buoys in Marina Reservoir215https://www.pub.gov.sg/marinabarrage/notices/MooringBuoysinMarinaReservoirMooring Buoys in Marina Reservoir9/23/2009 4:00:00 PMMooringBuoysinMarinaReservoir.aspx
Rocky Area in Kallang Basin - Updated on 08 Sep 2009308https://www.pub.gov.sg/marinabarrage/notices/RockyAreainKallangBasinUpdatedon08Sep2009Rocky Area in Kallang Basin - Updated on 08 Sep 20099/7/2009 4:00:00 PMRockyAreainKallangBasinUpdatedon08Sep2009.aspx
Navigational Safety Directive225https://www.pub.gov.sg/marinabarrage/notices/NavigationalSafetyDirectiveNavigational Safety Directive4/6/2007 4:00:00 PMNavigationalSafetyDirective.aspx