Sign In
True

​​

Notice Detail

 

 

Star Island Countdown 2022/2023 Fireworks Set up and Removal works and Full Water Closure Timings at Marina Bay523https://www.pub.gov.sg/marinabarrage/notices/2022Notice56Star Island Countdown 2022/2023 Fireworks Set up and Removal works and Full Water Closure Timings at Marina BayOverview<table class="MsoNormalTable" border="1" cellspacing="0" cellpadding="0" width="100%" style="width:100%;border:none;"><tbody><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:1pt solid #1a1a1a;border-left:1pt solid #1a1a1a;border-bottom:none;border-right:none;background:#00796b;padding:15pt;height:37.5pt;"><p class="MsoNormal" style="margin-bottom:0cm;"> <span style="font-size:12pt;font-family:roboto-bold-webfont, serif;color:white;">Date of Notice​</span></p></td><td style="border-top:1pt solid #1a1a1a;border-left:none;border-bottom:none;border-right:1pt solid #1a1a1a;background:#e5e5e5;padding:15pt;height:37.5pt;"><p class="MsoNormal" style="margin-bottom:0cm;"> <strong><span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">05 Dec 2022​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#009688;padding:15pt;height:37.5pt;">​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <span style="font-size:12pt;font-family:roboto-bold-webfont, serif;color:white;">Date and Time</span></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;padding:15pt;height:37.5pt;">​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong> <span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">Refer to schedule below​​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#00796b;padding:15pt;height:37.5pt;">​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font color="#ffffff" face="roboto-bold-webfont, serif"> <span style="font-size:16px;">Location</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;background:#e5e5e5;padding:15pt;height:37.5pt;">​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong><span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">​Kallang Basin, Marina Channel and Marina Bay​​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#009688;padding:15pt;height:37.5pt;">​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font color="#ffffff" face="roboto-bold-webfont, serif"> <span style="font-size:16px;">Craft</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;padding:15pt;height:37.5pt;">​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong><span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">RZ 58, SR 3639J, SR 3876H, Kairos boats (SZH 20388B, SZH 1690G, SZH 1694Z, SZ 21474D, SZH 1693A, SZH 1790C, SZH 1794F)​​​​​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#00796b;padding:15pt;height:37.5pt;">​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font color="#ffffff" face="roboto-bold-webfont, serif"> <span style="font-size:16px;">Contact</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;background:#e5e5e5;padding:15pt;height:37.5pt;">​ <p>Teng Mun Kit (Avex Asia Com Post)<br><a>teng-munkit@av.avex.co.jp</a><br><br>​Adam Tan (Glorious Singapore Pte Ltd)<br>​<a>adam@glorious.com.sg</a><br><br>​Kwek Teck Kee (Glorious Singapore Pte Ltd)<br><a>kwektk@glorious.com.sg</a><br><br>Roy (Kairos Strategic Pte Ltd)<br><a>roy.s@kairosboats.com</a>​ ​​<br></p> <br> </td></tr></tbody></table>​​​​<br>​ <div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">1​.</span> </div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;">​​​There will be installation and removal works in Kallang Basin, Marina Floating Platform & Marina Bay from 7th Dec 2022 to 14th Jan 2023. Please refer to the table below for the schedule of works and activities and the location maps <a href="/Documents/StarIslandCountdown2023WaterTrafficControlMarinaBay2Dec2022.pdf">here.</a>​​​</span><br>​<br>​<br></div><div><div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">2​​​.</span> </div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;">Safety lines using line of floats, red colour buoys and no-entry signs with flashing lights will be installed. These will mark the borders indicating the NO-ENTRY ZONES​.​</span><br>​<br> <div><table border="1" cellspacing="0" cellpadding="0" width="100%"><tbody><tr><td width="135"><p><b>Date</b>​</p></td><td width="133"><p><b>Time</b></p></td><td><p><b>Activities</b></p></td><td><p><b>Safety Remarks</b>​<br></p></td></tr><tr><td width="135" valign="top"><p> 7<sup>th, </sup>8<sup>th</sup>, 9<sup>th </sup>Dec 2022 </p></td><td width="133" valign="top"><p align="center"> 1000hrs - 1800hrs </p></td><td valign="top"><p> Towing pontoons/Cubi system from WWS to Kallang Basin (Republic Ave) and set up works. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> 9<sup>th</sup> – 10<sup>th</sup> Dec 2022 </p><p> (Reserve 11<sup>th</sup> Dec) </p></td><td width="133" valign="top"><p align="center"> 1000hrs - 1800hrs </p></td><td valign="top"><p> Towing Cubi system from </p><p> Marina Bay to Republic Ave </p><p> and set up works. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> 12<sup>th</sup> – 14<sup>th</sup> Dec 2022 </p></td><td width="133" valign="top"><p align="center"> 1000hrs – 1700hrs </p></td><td valign="top"><p> Craning ops at Kallang Basin (Republic Ave and Marina Floating platform area) </p><p> Configuration of cubi and pontoons @ Kallang Basin (Republic Ave) </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> <br> 17<sup>th</sup> – 21<sup>st</sup> Dec 2022 </p></td><td width="133" valign="top"><p align="center"> <br> 1000 – 1800 hrs </p></td><td valign="top"><p> Towing of pontoons/Cubi system from Kallang Basin (Republic Ave) to the Marina Bay and Marina Floating Platform for positioning and anchoring. Safety lines using line of floats and red colour buoys with flashing lights will be installed. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> 22<sup>nd</sup> & 23<sup>rd</sup> Dec 2022 </p></td><td width="133" valign="top"><p align="center"> 1000 – 1800 hrs </p></td><td valign="top"><p> Safety lines using line of floats and red colour buoys with flashing lights will be installed. </p><p> Finale adjustment of pontoons and position if needed. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 2) </p></td></tr><tr><td width="135" valign="top"><p> 24<sup>th</sup> Dec 2022 </p><p> (Reserve 25<sup>th</sup> Dec) </p></td><td width="133" valign="top"><p align="center"> 1000 – 1800 hrs </p></td><td valign="top"><p> Transferring / towing of fireworks from Republic Ave (Kallang Basin and Marina floating platform) to Marina Bay for installation process. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> 27<sup>th</sup> Dec 2022 </p><p> (Reserve 28<sup>th</sup> Dec) </p></td><td width="133" valign="top"><p align="center"> 1000 – 1800 hrs </p></td><td valign="top"><p> Transferring / towing of fireworks from Republic Ave (Kallang Basin and Marina Floating platform) to Marina Bay for installation process. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of setup areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> 30<sup>th</sup> Dec to 31<sup>st</sup> Dec </p></td><td width="133" valign="top"><p align="center"> 1000 – 2000 hrs </p></td><td valign="top"><p> Installing of water barricades at the two closure limits (Esplanade and Helix Bridge) </p></td><td valign="top"><p> All vessels are to keep clear of setup areas. </p></td></tr><tr><td width="135" valign="top"><p style="color:red;"> 31<sup>st</sup> Dec 2022 – 1<sup>st</sup> Jan 2023 </p></td><td width="133" valign="top"><p align="center" style="color:red;"> 31<sup>st</sup> Dec 2022, 2000 hrs to 1<sup>st</sup> Jan 2023, 0200hrs </p></td><td valign="top"><p style="color:red;"> D Day – Full closure at Marina Bay (water barricades at the two closure limits effective) </p></td><td valign="top"><p style="color:red;"> All vessels are not to enter Marina Bay and stay behind the water barricades. </p><p style="color:red;"> All vessels are to comply with the instructions/ directions given by the safety/security boats’ crew and Police Coast Guard deployed. </p><p style="color:red;"> (Refer to Map 3 and 4) </p></td></tr><tr><td width="135" valign="top"><p style="color:red;"> 31<sup>st</sup> Dec 2022 – 1<sup>st</sup> Jan 2023 </p></td><td width="133" valign="top"><p align="center" style="color:red;"> 31<sup>st</sup> Dec 2022, 2230 hrs to 1<sup>st</sup> Jan 2023, 0030hrs </p></td><td valign="top"><p style="color:red;"> Show time with fireworks displays </p></td><td valign="top"><p style="color:red;"> All vessels are not to enter Marina Bay and stay behind the water barricades. All vessels are to comply with the instructions/ directions given by the safety/security boats’ crew and Police Coast Guard deployed. </p><p style="color:red;"> (Refer to Map 3 and 4) </p></td></tr><tr><td width="135" valign="top"><p> <br> 2<sup>nd</sup> – 5<sup>th</sup> Jan 2023 </p></td><td width="133" valign="top"><p align="center"> <br> 1000 – 1800 hrs </p></td><td valign="top"><p> Removal of water barricades, red colour buoys and no-entry signs at the Marina Bay and Marina Floating platform. De-Installation of pontoons. </p><p> Towing of pontoon/Cubi system from Marina bay and floating platform back to Kallang Basin (Republic Ave) for dismantling. </p></td><td valign="top"><p> All vessels are to keep a wide berth to the towing operations and keep clear of tear-down areas. (Refer to Map 1) </p></td></tr><tr><td width="135" valign="top"><p> 9<sup>th</sup> – 12<sup>th</sup> Jan 2023 </p></td><td width="133" valign="top"><p align="center"> <br> 1000 – 1700 hrs </p></td><td valign="top"><p> <br> Recovery craning ops at Kallang Basin (Republic Ave) </p></td><td><p> All vessels are to keep a wide berth to the towing operations and keep clear of the areas. </p></td></tr><tr><td width="135" valign="top"><p> 12<sup>th</sup> – 14<sup>th</sup> Jan 2023 </p></td><td width="133" valign="top"><p align="center"> 1000 – 1800 hrs </p></td><td valign="top"><p> Towing pontoons/Cubi system back to WWS from Kallang Basin (Republic Ave). </p><p> Works at Republic Ave. </p></td><td><p> All vessels are to keep a wide berth to the towing operations and keep clear of the areas. (Refer to Map 1) </p></td></tr></tbody></table>​<br><br></div> <br> </div></div> <br>​<br>