Chingay 2023 Fireworks Setup and Removal Works and Water Closure Timings at Marina Channel (beside F1 Pit Building) | 530 | https://www.pub.gov.sg/marinabarrage/notices/2022Notice63 | Chingay 2023 Fireworks Setup and Removal Works and Water Closure Timings at Marina Channel (beside F1 Pit Building) | | | Overview | | | | | | | | | | <table class="MsoNormalTable" border="1" cellspacing="0" cellpadding="0" width="100%" style="width:100%;border:none;"><tbody><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:1pt solid #1a1a1a;border-left:1pt solid #1a1a1a;border-bottom:none;border-right:none;background:#00796b;padding:15pt;height:37.5pt;"><p class="MsoNormal" style="margin-bottom:0cm;">
<span style="font-size:12pt;font-family:roboto-bold-webfont, serif;color:white;">Date of Notice</span></p></td><td style="border-top:1pt solid #1a1a1a;border-left:none;border-bottom:none;border-right:1pt solid #1a1a1a;background:#e5e5e5;padding:15pt;height:37.5pt;"><p class="MsoNormal" style="margin-bottom:0cm;">
<strong>
<span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">19 Jan 2023</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#009688;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<font color="#ffffff" face="roboto-bold-webfont, serif"><span style="font-size:16px;">Date and Time</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<font color="#323232" face="roboto-regular-webfont, serif"><span style="font-size:16px;"><b>Refer to schedule below</b></span></font></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#00796b;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<font color="#ffffff" face="roboto-bold-webfont, serif">
<span style="font-size:16px;">Location</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;background:#e5e5e5;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<strong>
<span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">Kallang Basin, Marina Channel</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#009688;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<font color="#ffffff" face="roboto-bold-webfont, serif">
<span style="font-size:16px;">Craft</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<strong><span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">SR 3639J, SR 3876H, RZ58, SZ 20649J, SZ 17078G</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;border-top:none;border-right:none;border-bottom:none;border-left:1pt solid #1a1a1a;background:#00796b;padding:15pt;height:37.5pt;">
<p class="MsoNormal" style="margin-bottom:0cm;">
<font color="#ffffff" face="roboto-bold-webfont, serif">
<span style="font-size:16px;">Contact</span></font></p></td><td style="border-top:none;border-bottom:none;border-left:none;border-right:1pt solid #1a1a1a;background:#e5e5e5;padding:15pt;height:37.5pt;">
<p>Rex Aw (People’s Association)<br>Rex_aw@pa.gov.sg<br><br>Adam Tan (Glorious Singapore Pte Ltd)<br>adam@glorious.com.sg<br><br>Kwek Teck Kee (Glorious Singapore Pte Ltd)<br>kwektk@glorious.com.sg<br></p>
<br>
</td></tr></tbody></table><br>
<div style="float:left;width:3%;">
<span style="font-size:18px;line-height:30px;">1.</span> </div><div style="float:left;width:97%;">
<span style="font-size:18px;line-height:30px;">There will be installation and removal works in Kallang Basin and Marina Channel from 26th Jan 2023 till 17th Feb 2023. Please refer to the table below for the schedule of works/ activities and the location maps
<a href="/Documents/Chingay_2023_water_traffic_plan.pdf">here</a>.</span><br><br></div><div style="float:left;width:3%;">
<span style="font-size:18px;line-height:30px;">2.</span> </div><div style="float:left;width:97%;">
<span style="font-size:18px;line-height:30px;">Safety lines using line of floats, red colour buoys and no-entry signs with flashing lights will be installed. These will mark the borders indicating the NO-ENTRY ZONES.</span><br><br></div><div style="float:left;width:3%;">
<span style="font-size:18px;line-height:30px;">3.</span> </div><div style="float:left;width:97%;">
<span style="font-size:18px;line-height:30px;">All vessels are to keep clear of the water barricades at Marina Channel and ply outside the water barricades at all times, during non-closure period.</span><br><br></div><div style="float:left;width:3%;">
<span style="font-size:18px;line-height:30px;">4.</span> </div><div style="float:left;width:97%;">
<span style="font-size:18px;line-height:30px;">Marina Channel will be partially closed to all water traffic on 3 and 4 Feb 2023, from 1900 hrs to 2200 hrs.. All vessels are to keep clear of the safety radius and stay behind the safety boats. All vessels are advised to comply with the instructions and directions given by the safety boats crew.</span><br><br></div><div><table border="1" cellspacing="0" cellpadding="0" width="100%"><tbody><tr><td width="135"><p>
Date
</p></td><td width="133"><p>
Time
</p></td><td><p>
Activities
</p></td><td><p>
Safety Remarks
</p></td></tr><tr><td width="135" valign="top"><p>
26<sup>th</sup> & 27<sup>th</sup> Jan 2023
</p></td><td width="133" valign="top"><p align="center">
1000hrs - 1800hrs
</p></td><td valign="top"><p>
Towing pontoons/Cubi system from WWS to Kallang Basin
(Republic Ave) and set up works.
</p></td><td valign="top"><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of setup areas
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
28<sup>th</sup> - 29<sup>th</sup> Jan 2023
</p></td><td width="133" valign="top"><p align="center">
1000hrs – 1600hrs
</p></td><td valign="top"><p>
Craning ops at Kallang Basin (Republic Ave)
</p><p>
Configuration of cubi and pontoons @ Kallang Basin(Republic
Ave).
</p><p>
Configuration of cubi and pontoons at Kallang Basin
(Republic Ave).
</p></td><td valign="top"><p>
All vessels are to keep clear of setup areas
</p><p>
(Refer to Map 1 and 2).
</p></td></tr><tr><td width="135" valign="top"><p>
<br>
30<sup>th</sup> Jan 2023
</p><p>
(Reserve date 31<sup>st</sup> Jan 2023)
</p></td><td width="133" valign="top"><p align="center">
<br>
1000 – 1800 hrs
</p></td><td valign="top"><p>
Towing of pontoons/Cubi system from Kallang Basin (Republic
Ave) to Marina Channel for positioning and anchoring.
Safety lines using line of floats and red colour buoys with
flashing lights will be installed.
</p></td><td valign="top"><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of setup areas
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
30<sup>th</sup> Jan 2023
</p><p>
(Reserve date 31<sup>st</sup> Jan 2023)
</p></td><td width="133" valign="top"><p align="center">
1000 – 1800 hrs
</p></td><td valign="top"><p>
Safety lines using line of floats and red colour buoys with
flashing lights will be installed.
</p><p>
Finale adjustment of pontoons and position if needed.
</p></td><td valign="top"><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of setup areas
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
31<sup>st</sup> Jan 2023
</p><p>
(Reserve date 1<sup>st</sup> Feb 2023)
</p></td><td width="133" valign="top"><p align="center">
1000 – 1800 hrs
</p></td><td valign="top"><p>
Transferring / towing of Mid level fireworks from Republic
Ave to Marina Channel for installation process.
</p></td><td valign="top"><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of setup areas
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
31<sup>st</sup> Jan – 5<sup>th</sup> Feb 2023
</p></td><td width="133" valign="top"><p align="center">
1000 – 2000hrs
</p></td><td valign="top"><p>
Mid level fireworks installation work in progress at Marina
Channel site.
</p></td><td valign="top"><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of setup areas
</p><p>
(Refer to Map 1).
</p><p>
All vessels are to follow the navigational route in Map 2.
</p></td></tr><tr><td width="135" valign="top"><p>
3<sup>rd</sup> and 4<sup>th</sup> Feb 2023
</p></td><td width="133" valign="top"><p align="center">
1900 – 2200hrs
</p></td><td valign="top"><p>
Show day 1 and 2- Partial closure of water traffic.
</p></td><td valign="top"><p>
All vessels are to keep clear of the safety radius and stay
behind the safety boats. All vessels are advised to comply
with the instructions and directions given by the safety
boats’ crew. (Refer to Map 3)
</p></td></tr><tr><td width="135" valign="top"><p>
3<sup>rd</sup> and 4<sup>th</sup> Feb 2023
</p></td><td width="133" valign="top"><p align="center">
2000 – 2130hrs
</p></td><td valign="top"><p>
Show Day 1 and 2 mid level fireworks display.
</p></td><td valign="top"><p>
All vessels are to keep clear of the safety radius and stay
behind the safety boats. All vessels are advised to comply
with the instruction and directions given by the safety
boats’ crew. (Refer to Map 3)
</p></td></tr><tr><td width="135" valign="top"><p>
5<sup>th</sup> & 6<sup>th</sup> Feb 2023
</p><p>
(Reserve date 7<sup>th</sup> Feb 2023)
</p></td><td width="133" valign="top"><p align="center">
1000 – 1800 hrs
</p></td><td valign="top"><p>
Removal of water barricades, red colour buoys and no-entry
signs at the Marina Channel. De-Installation of pontoons.
</p><p>
Towing of pontoon/Cubi system from Marina Channel back to
Kallang Basin (Republic Ave) for dismantling.
</p></td><td valign="top"><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of tear-down areas.
</p><p>
(Refer to Map 1 and 2).
</p></td></tr><tr><td width="135" valign="top"><p>
6<sup>th</sup> & 7<sup>th</sup> Feb 2023
</p></td><td width="133" valign="top"><p align="center">
1000 – 1600 hrs
</p></td><td valign="top"><p>
<br>
Recovery craning ops at Kallang Basin (Republic Ave).
</p></td><td><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of the areas.
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
8<sup>th</sup> Feb 2023
</p><p>
(Reserve date 9<sup>th</sup> Feb 2023)
</p></td><td width="133" valign="top"><p align="center">
1000 – 1800 hrs
</p></td><td valign="top"><p>
Towing pontoons/Cubi system back to WWS from Kallang Basin
(Republic Ave). Works at Republic Ave.
</p><p>
(Chingay 2023 – Wooden pontoons)
</p></td><td><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of the areas.
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
13<sup>th</sup> & 14<sup>th</sup> Feb 2023
</p><p>
(Reserve date 15<sup>th</sup> Feb 2023)
</p></td><td width="133" valign="top"><p align="center">
1000 – 1600hrs
</p></td><td valign="top"><p>
Recovery craning ops at Kallang Basin (Republic Ave).
</p><p>
Returning of floating system from GBB South after RHB 2023.
</p><p>
Towing pontoons/Cubi system back to WWS from Kallang Basin
(Republic Ave). Works at Republic Ave.
</p></td><td><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of the areas.
</p><p>
(Refer to Map 1).
</p></td></tr><tr><td width="135" valign="top"><p>
16<sup>th</sup> & 17<sup>th</sup> Feb 2023
</p></td><td width="133" valign="top"><p align="center">
1000 – 1600hrs
</p></td><td valign="top"><p>
Recovery craning ops at Kallang Basin (Republic Ave).
</p><p>
Craning of work boats from Republic Ave.
</p></td><td><p>
All vessels are to keep a wide berth to the towing
operations and keep clear of the areas.
</p><p>
(Refer to Map 1).
</p></td></tr></tbody></table><br></div> | | | | | | | | | |