Sign In
True

​​

Notice Detail

 

 

REMOVAL AND LIFTING OF PONTOON UNDER BENJAMIN SHEARS BRIDGE536https://www.pub.gov.sg/marinabarrage/notices/2022Notice69REMOVAL AND LIFTING OF PONTOON UNDER BENJAMIN SHEARS BRIDGEOverview<table class="MsoNormalTable" border="0" cellspacing="0" cellpadding="0" width="100%" style="width:100%;border:0px;"><tbody><tr style="height:37.5pt;"><td width="251" style="width:188pt;height:37.5pt;">​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <span style="font-size:12pt;font-family:roboto-bold-webfont, serif;">Date of Notice:​</span></p></td><td style="height:37.5pt;">​ <p class="MsoNormal" style="margin-bottom:0cm;"><strong><span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">22 Apr 2023​​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;height:37.5pt;">​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <span style="font-size:12pt;font-family:roboto-bold-webfont, serif;">Period Of Work:​</span></p></td><td style="height:37.5pt;">​​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong><span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">24 Apr 2023 – 27 Apr 2023​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;height:37.5pt;">​​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font face="roboto-bold-webfont, serif"> <span style="font-size:16px;">Time​:​</span></font></p></td><td style="border-top:none;height:37.5pt;">​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong> <span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">0830 hrs – 1800 hrs​​​​​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;height:37.5pt;">​​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font face="roboto-bold-webfont, serif"> <span style="font-size:16px;">Location:​</span></font></p></td><td style="height:37.5pt;">​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong> <span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">Below Benjamin Shears Bridge at Marina Reservoir<br>(see map below for location of bridge)​​​​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;height:37.5pt;">​​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font face="roboto-bold-webfont, serif"><span style="font-size:16px;">Crafts:​</span></font></p></td><td style="height:37.5pt;">​​​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong> <span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">RC 969 Work Boat​</span></strong></p></td></tr><tr style="height:37.5pt;"><td width="251" style="width:188pt;height:37.5pt;">​​​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <font face="roboto-bold-webfont, serif"> <span style="font-size:16px;">Contact:​</span></font></p></td><td style="height:37.5pt;">​​​ <p class="MsoNormal" style="margin-bottom:0cm;"> <strong> <span style="font-size:12pt;font-family:roboto-regular-webfont, serif;color:#323232;">Mr. Derek Chong (Hp: 9832 9954) / Mr. Elanchezian (Hp: 8696 6679)<br>(Asia Projects Engineering Pte. Ltd.)​​​​​</span></strong></p></td></tr></tbody></table>​​​​<br><br>​​​​ <div><div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">1​.</span> </div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;">​​The main scope of work is to remove one existing pontoon from Under Benjamin Shears Bridge to be transported to Pandan Reservoir for installation.​​</span><br>​<br></div></div><div><div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">2​.</span> </div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;">RC 969 work Boat will be deployed to allow workers to access the corners and edges of the pontoon in order to carry out the dismantling works.​</span><br>​<br> <div> <img src="/sites/assets/MarinaBarrageAssets/RC969PontoonWork04Mar2023.JPG" alt="RC969Pontoon" style="margin:20px;max-width:100%;max-height:100%;" />​<br><br> <div align="center"> <b><u>Photos of RC 969 and Pontoon work location</u></b></div>​<br>​<br></div></div><div> <span style="font-size:18px;line-height:30px;"><b><u>Lifting Area and Site Plan</u></b></span>​<br></div>​ <div><div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">3​.</span> </div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;">Works Location</span><br>​<br> <div> <img src="/sites/assets/MarinaBarrageAssets/LiftingArea04Mar2023.JPG" alt="Lifting" style="margin:20px;max-width:100%;max-height:100%;" />​<br><img src="/sites/assets/MarinaBarrageAssets/SitePlan04Mar2023.JPG" alt="SitePlan" style="margin:20px;max-width:100%;max-height:100%;" /><br><br>​<br></div></div>​ <div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">4​​.</span></div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;"><b><u>S​chedule of works:</u></b>​​​​</span>​​<br>​ <div><table width="600" border="1"><tbody><tr><td width="180">​​​​​​ <strong><u>​Date</u></strong>​ <p></p></td><td width="216"><p> <strong><u>Working Area</u>​</strong></p></td><td width="204"><p> <strong> <u>Working Hours</u>​</strong></p></td></tr><tr><td width="180"><p>24 Apr – 27 Apr 2023​<br></p></td><td width="216"><p>Benjamin Shears Bridge​​<br></p></td><td width="204"><p>0830 to 1800​<br></p></td></tr></tbody></table>​​​​​</div>​</div>​​ <div><div style="float:left;width:3%;"> <span style="font-size:18px;line-height:30px;">5​​.</span> </div><div style="float:left;width:97%;"> <span style="font-size:18px;line-height:30px;">​​All vessels and recreation Crafts are advised to keep a wide berth from RC 969 work boat, slow down when in the vicinity of the working areas and to keep a look out for the work boat on the working area.​</span><br>​<br>​<br></div></div></div>​<br>​<br></div>