Sign In
True

​​

Notice Detail

 

 

Benjamin Sheares Bridge Bearings Replacement Works35https://www.pub.gov.sg/marinabarrage/notices/BenjaminShearesBridgeBearingsReplacementWorks2019Benjamin Sheares Bridge Bearings Replacement WorksOverview<table width="100%" class="ms-rteTable-GreenShade" cellspacing="0"><tbody><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;height:70px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Date of Notice</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;height:70px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"> <strong>13 Nov 2019​</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Period of Work</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​15 Nov 2019 to 31 Jan 2020</span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Time of Work</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"> <strong>0830 hrs to 2230 hrs (Day), 2230 hrs to 0500 hrs (Night)</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Location</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"> <strong>Benjamin Sheares Bridge</strong></span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Craft</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​<strong>RC 265 & RC 407 Safety Boat​s</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Contacts</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​<strong>Sathish @ 9029 6464 (Gim Tian Civil Engineering)<br>Jimmy @ 9017 7429 (Gim Tian Civil Engineering) </strong></span></td></tr></tbody></table>​ <p>1.   This project is associated with LTA Contract TR252 Replacement of Vehicular Bridge Bearings and Gim Tian Civil Engineering Pte Ltd is the appointed contractor by LTA.</p><p>2​.   ​The scope of proposed works is as follows:<br><br>Phase 2 – Installation of temporary platform scaffold access to the underside of Benjamin Sheares Bridge <br>​ <br> Phase 3 – Carry out jacking operation & bearings replacement works at the respective piers mentioned above​​</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/MOOG-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Photo of the MOOG Machine</strong></p><p>3.    RC 265 & RC 407 safety boats would be deployed at the respective pier locations daily at 0830 hrs from the amphibious vessel splash point at the F1 Pit Stop Building. The safety boats would be lifted out by a lorry crane from the splash point daily after works at 0500 hrs.​ </p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/RC-265-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/RC-407.jpg" class="border-0" alt="" style="margin:5px;" /> </p>​ <p style="text-align:center;"> <strong style="text-decoration:underline;">Photo of RC 265 & RC 407 Safety Boat​s</strong></p><p>4.    At least two (2) sets of oil containment boom in yellow with warning lights would be deployed on waters to demarcate the area directly underneath where the MOOG machine is operating. RC 265 & RC 407 safety boat would be deployed nearby to keep out approaching vessels. All vessels are to adhere to the instructions from the safety boat operator.​</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Oil-Boom-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Sample Photo of the Oil Containment Boom in Yellow</strong></p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Blinker-light.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Sample Photo of the Blinker Light installed on Boom for Night Works</strong></p><p>5. Proposed schedule of works for Phase 2 & 3 are as follow:​</p><div class="scrollbar" style="display:none;"><div class="handle" style="width:881px;"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0" style="overflow:hidden;"><div class="scrollbar" style="width:0px;display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><table width="100%" class="tablestandard bookingstep2 extend-mg-btm" border="0" cellspacing="0" cellpadding="0" style="max-width:none;width:100%;"><tbody><tr class="row_header"><td>PERIOD OF WORKS</td><td>WORKS DESCRIPTION</td></tr><tr class="extheight1"><td>15 Nov 2019 - 17 Dec 2019</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P8 </td></tr><tr class="extheight1"><td>15 Nov 2019 – 24 Dec 2019</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P19</td></tr><tr class="extheight1"><td>20 Nov 2019 – 3 Jan 2020</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P20</td></tr><tr class="extheight1"><td>20 Nov 2019 – 10 Jan 2020</td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P21</td></tr><tr class="extheight1"><td>27 Nov 2019 – 31 Jan 2020 </td><td>Installation of temporary platform scaffold & Jacking and Bearing Replacement work at Pier P18​</td></tr></tbody></table></div></div></div>​ <p>5.   Please refer to the <a href="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageDocuments/Pier-Location-and%20water-traffic-plan%20%28P6-P8%29-and-%28P18-P21%29.pdf" style="text-decoration:underline;">drawings</a> for the pier locations and water traffic plan throughout the works period. </p><p>6.   All vessels are advised to look out for the oil containment boom, keep clear of the work areas and slow down when in the vicinity. </p>​