Sign In
True

​​

Notice Detail

 

 

Benjamin Sheares Bridge Bearings Replacement Works Phase 438https://www.pub.gov.sg/marinabarrage/notices/BenjaminShearesBridgeBearingsReplacementWorksPhase4Benjamin Sheares Bridge Bearings Replacement Works Phase 4Overview<table width="100%" class="ms-rteTable-GreenShade" cellspacing="0"><tbody><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;height:70px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Date of Notice</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;height:70px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"><strong>20 Nov 2020</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Period of Work</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​25 Nov 2020 to 31 Dec 2020</span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Time of Work</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"><strong>0830 hrs to 2230 hrs </strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Location</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;"><strong>Benjamin Sheares Bridge</strong></span></td></tr><tr class="ms-rteTableEvenRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Craft</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​<strong>RC 265 Safety Boat​</strong></span></td></tr><tr class="ms-rteTableOddRow-GreenShade"><th class="ms-rteTableFirstCol-GreenShade" rowspan="1" colspan="1" style="width:410px;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​Contacts</span></th><td class="ms-rteTableOddCol-GreenShade" style="width:73%;"> <span style="font-family:roboto-bold-webfont;font-size:15pt;">​<strong>Sathish   @ 9029 6464 (Gim Tian Civil Engineering)<br>Mubarak @ 9188 7512 (Gim Tian Civil Engineering) </strong></span></td></tr></tbody></table>​ <p>1.   This project is associated with LTA Contract TR252 Replacement of Vehicular Bridge Bearings and Gim Tian Civil Engineering Pte Ltd is the appointed contractor by LTA.</p><p>2​.   ​The scope of proposed works is as follows:<br>​ <br> Phase 4 – Dismantling of temporary platform scaffold access to the underside of Benjamin Sheares Bridge at the respective piers mentioned below.</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/MOOG-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Photo of the MOOG Machine</strong></p><p>3.    RC 265 safety boat would be deployed at the respective pier locations daily at 0830 hrs from the amphibious vessel splash point at the F1 Pit Stop Building. The safety boat would be lifted out by a lorry crane from the splash point daily after works at 2230 hrs.​ </p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/RC-265-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;text-decoration:underline;"> <strong>Photo of RC 265 Safety Boat</strong></p><p>4.    ​At least two (2) sets of oil containment boom in yellow with warning lights would be deployed on waters to demarcate the area directly underneath where the MOOG machine is operating. RC 265 safety boat would be deployed nearby to keep out approaching vessels. All vessels are to adhere to the instructions from the safety boat operator.</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Oil-Boom-image.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Sample Photo of the Oil Containment Boom in Yellow</strong></p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/Blinker-light.jpg" class="border-0" alt="" style="margin:5px;" /> </p><p style="text-align:center;"> <strong style="text-decoration:underline;">Sample Photo of the Blinker Light installed on Boom for Night Works</strong></p><p>5. Proposed schedule of works for Phase 4 as follow:​</p><div class="scrollbar" style="display:none;"><div class="handle" style="width:881px;"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0" style="overflow:hidden;"><table width="100%" class="tablestandard bookingstep2 extend-mg-btm" border="0" cellspacing="0" cellpadding="0" style="max-width:none;width:880px;"><tbody><tr class="row_header"><td>PERIOD OF WORKS</td><td>WORKS DESCRIPTION</td></tr><tr class="extheight1"><td>25 Nov 2020 – 30 Dec 2020</td><td>Dismantling of temporary platform scaffold at Pier 18 – Pier 21</td></tr></tbody></table>​ </div><p>5.   Please refer to the <a href="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageDocuments/Pier-Location-and%20water-traffic-plan%20%28P6-P8%29-and-%28P18-P21%29.pdf" style="text-decoration:underline;">drawings</a> for the pier locations and water traffic plan throughout the works period. </p><p>6.   All vessels are advised to look out for the oil containment boom, keep clear of the work areas and slow down when in the vicinity. </p>​​