Sign In
True

​​

Notice Detail

 

 

Restoration Works at Alkaff Bridgehttp://www.pub.gov.sg/marinabarrage/notices/RestorationWorksatAlkaffBridgeRestoration Works at Alkaff BridgeOverview<div class="scrollbar" style="display:none;"><div class="handle" style="width:881px;"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0" style="overflow:hidden;"><table width="100%" class="tablestandard bookingstep2 extend-mg-btm" border="0" cellspacing="0" cellpadding="0" style="max-width:none;width:880px;"><tbody><tr><td class="col_header green" style="width:180px;">Date of Notice</td><td> <strong>15 Mar 2019</strong></td></tr><tr><td class="col_header green" style="width:180px;">Period of Work</td><td> <strong>15 Mar 2019 to 31 Jul 2019</strong></td></tr><tr><td class="col_header green" style="width:180px;">Time of Work</td><td> <strong>0800 hrs to 2100 hrs</strong></td></tr><tr><td class="col_header green" style="width:180px;">Location</td><td> <strong>Alkaff Bridge @ Singapore River</strong></td></tr><tr><td class="col_header green" style="width:180px;">​Craft</td><td> <strong>RC 241 Safety Boat<br> RC 242 Backup Safety Boat<br>​</strong></td></tr><tr><td class="col_header green" style="width:180px;">​Contact</td><td> <strong>Mr Chai @ 9019 8678 (Chye Joo Construction)​<br>Mr Michael @ 8450 8537 (Chye Joo Construction) ​​</strong></td></tr></tbody></table></div>​ <p> 1. Chye Joo Construction Pte Ltd is the appointed contractor by LTA to carry out restoration works at Alkaff Bridge from 15 March 2019 to 31 July 2019.</p><p style="text-align:center;">​​<img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/AlkaffBridgeMap.png" class="border-0" alt="" style="margin:5px;" /> <br></p><p style="text-align:center;text-decoration:underline;"> <strong>Location of Alkaff Bridge</strong>​​</p>​​ <p>2. During this period, scaffolds will be erected at the bridge as shown in the plan below, followed by painting/restoration works.</p><p style="text-align:center;"> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/AlkaffBridgeScaffoldView.png" class="border-0" alt="" style="margin:5px;" /> ​ <br> </p><p style="text-align:center;text-decoration:underline;"> <strong>Vessels Height Clearance​</strong>​​</p>​​ <p>3. Based on the normal reservoir level of 100.0mRL, the scaffolding structure has a height clearance of 3.5m with a span of 37m within the centre of the bridge. Warning signs and blinker lights will be installed across the bridge to warn all stakeholders and boat operators.</p><p>4. During adverse weather conditions, the reservoir level may rise to 101.5mRL, leaving a height clearance of 2.05m. Stakeholders and boat operators are advised to look out for the reservoir water level rulers installed at various locations along Singapore River to check the water level.</p>​ <p> 5. RC 241 safety boat would be deployed to guide and warn approaching vessels and RC 242 is assigned as the backup safety boat. The safety boat will return to Kallang Basin daily after working hours. </p><p> 6. All vessels are advised to look out for the warning signs, blinker lights, adhere to the instructions by the safety boat and slow down upon approaching Alkaff Bridge. </p>7/17/2019 2:28:28 PM