Sign In
True

​​

Notice Detail

 

 

SPF 200343https://www.pub.gov.sg/marinabarrage/notices/SPF200SPF 200Overview<div class="scrollbar" style="display:none;"><div class="handle" style="width:881px;"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0" style="overflow:hidden;"><div class="scrollbar" style="width:0px;display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><div class="scrollbar" style="display:none;"><div class="handle"><div class="mousearea"></div></div></div><div class="table_nonresponds_wrapper" id="tableWrapper0"><table width="100%" class="tablestandard extend-mg-btm" cellspacing="0" cellpadding="0" style="width:100%;max-width:none;"><tbody><tr><td class="col_header green ">Date of Notice</td><td> <strong>6 Jan 2020</strong></td></tr><tr><td class="col_header green ">Date of Event</td><td> <strong>9 to 12 Jan 2020 </strong></td></tr><tr><td class="col_header green " rowspan="1">Location</td><td rowspan="1"> <strong>Kallang Basin and Marina Channel​</strong></td></tr><tr><td class="col_header green " rowspan="1">Time of water closures </td><td rowspan="1"> <strong>See details below</strong></td></tr><tr><td class="col_header green " rowspan="1">​Craft​​</td><td rowspan="1"> <strong>up to 10 units of Police Coast Guard (PCG) craft</strong></td></tr><tr><td class="col_header green " rowspan="1">​​​​​Contact</td><td rowspan="1"> <strong>Ms Nur Hafizah @8102 5772 or Mr Tan Kwang Liang @9362 3134 (PCG)<br>Mr Teo Cher Kai, @8183 0683 (Pico Art International)​​</strong></td></tr></tbody></table></div></div></div></div></div><p>1.  The Singapore Police Force (SPF) will be organising its SPF 200 (Bicentenial) event at the Water Sports Centre at Kallang Basin and Marina Channel from 10 to 12 Jan 2020. There will be boat rides (partial water closure applies) and guest of honour convoy from Marina Barrage jetty to Water Sports Centre (WSC) at Kallang Basin (full water closure applies). </p> <br>​ <p style="text-decoration:underline;"> <strong>Event details and safety remarks</strong></p> <br>​​ <p>2.  On 9 Jan 2020, 0830 to 1700 hrs, PCG craft will be present in Kallang Basin and Marina Channel to familiarise the routes taken in Map 1 and 2.</p><br>​ <p>3.  For full water closure on 11 Jan 2020, 0845 to 0945 hrs, refer to Map 1.</p><p></p><ul class="list" style="margin-bottom:40px;"><li style="line-height:32.58px;font-size:18px;"> 4 units of PCG craft in convoy will ply at high speed from Marina Barrage jetty to Water Sports Centre (WSC) at Kallang Basin. </li><li style="line-height:32.58px;font-size:18px;">​Once the convoy approaches the fountain in the Kallang Basin, they will proceed to slow down to minimise the impact of wakes on the users in Kallang Basin. </li><li style="line-height:32.58px;font-size:18px;"> Full water closure for all non-motorised boats will be the areas within the red dotted lines. Other motorised vessels are to keep clear of the convoy route. 3 units of cordon PCG craft will be present. Cordon PC class PCG boats will be informed when the convoy is approaching activity areas of non-motorised vessels. Subsequently, the cordon boats will proceed to give warning and caution the non-motorised vessels to be careful and stay closer to shore until convoy have safely passed them.</li><li style="line-height:32.58px;font-size:18px;"> The main areas impacted will be the Marina East course and PassionWave vicinity during the one hour window.</li><li style="line-height:32.58px;font-size:18px;">The main consideration of the exclusion of non-motorised vessels in the mentioned area, is arising from the safety consideration (risk of capsize) from the wakes generated by the passing convoy, especially along the Marina Channel where the 1km racing course is located.</li><li style="line-height:32.58px;font-size:18px;"> All vessels are advised to comply with the instructions and signals given by the PCG craft crew.</li><li style="line-height:32.58px;font-size:18px;"> All vessels are to ply strictly within the navigational route as set out in the maps.</li></ul><p></p><p> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/SPF-200-Map-1.jpg" class="border-0" alt="" style="margin:5px;" />  </p><p> <strong>- Map 1 – Full closure for all non-motorised boats on 11 Jan for the areas within the red dotted lines. Other motorised vessels are to keep clear of the convoy route.</strong></p>​ <p> <strong>- Yellow line demarcates the convoy route.</strong></p> <br>​ <p>4.  For partial water closure from 10 to 12 Jan 2020, 0900 to 1800 hrs, refer to Map 2.</p><ul class="list" style="margin-bottom:40px;"><li style="line-height:32.58px;font-size:18px;"> 7 units of PCG craft will be used for boat rides for registered participants.</li><li style="line-height:32.58px;font-size:18px;">Partial water closure for all non-motorised vessels will be within the red dotted lines. Other motorised vessels are to keep clear of the boat rides route.</li><li style="line-height:32.58px;font-size:18px;">Boat rides will be held within the Water Sports Centre (WSC) 500m racing course from about the midway point @ 250m towards the ending point near Tanjong Rhu. The race course will be removed by Sports Hub to facilitate our event.​</li><li style="line-height:32.58px;font-size:18px;">All PCG craft will be plying away from the areas outside the demarcated zone. Craft will operate at slow speed with up to 4 craft operating in the waters at any one time.</li><li style="line-height:32.58px;font-size:18px;"> All vessels are advised to comply with the instructions and signals given by the PCG craft crew.</li><li style="line-height:32.58px;font-size:18px;"> All vessels are advised to comply with the instructions and signals given by the PCG craft crew.</li></ul><p> <img src="http://public.prdweb.pub.gov.sg/sites/assets/MarinaBarrageAssets/SPF-200-Map-2.jpg" class="border-0" alt="" style="margin:5px;" />  </p><p> <strong>- Map 2 – Partial closure for all non-motorised boats from 10 to 12 Jan for the area within the red dotted lines. All other motorised vessels are to keep clear of the boat rides route and only authorised vessels can enter Geylang River.</strong></p>​ <p> <strong>- Yellow line demarcates the route for all other vessels from 0900 to 1800 hrs.​</strong></p><p></p>